Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Life cycle
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (4): 2342–2368.
Published: 21 December 2023
.... These conflict risks change dynamically with different stages of the PP life cycle, increasing the challenge of PP risk management. Existing conflict risk research mainly focuses on source identification but lacks risk assessment work. To better manage the stakeholder conflict risks (SCRs) of R&D PPs...
Journal Articles
Engineering, Construction and Architectural Management (2021) 28 (9): 2736–2753.
Published: 09 November 2020
...Seyedhabibollah Sadrinooshabadi; Afshin Taheri; Ibrahim Yitmen; Rogier Jongeling Purpose Each building project demands an integrated method for information and requirement management in its life cycle. The main purpose of this paper is to explore the major obstacles in integrated life cycle...
Journal Articles
Engineering, Construction and Architectural Management (2013) 20 (4): 330–344.
Published: 28 June 2013
...Frank Collins Purpose Construction contractors and facility managers are being challenged to minimize the carbon footprint. Life cycle carbon‐equivalent (CO2‐e) accounting, whereby the potential emissions of greenhouse gases due to energy expenditure during construction and subsequent...
Journal Articles
Engineering, Construction and Architectural Management (1999) 6 (1): 71–77.
Published: 01 January 1999
... and major current projects, the paper discusses the eLSEwise perspective of life‐cycle oriented infrastructure management and the integrational aspects related to execution of a major infrastructure project and subsequent facility management. Finally, the paper identifies the major gaps between the current...
