Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Maturity
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2024) 31 (13): 181–207.
Published: 28 June 2022
... may be seen at http://creativecommons.org/licences/by/4.0/legalcode Project control systems Project success Maturity Engineering Construction Enablers Barriers The COVID 19 pandemic has and continues to have a dramatic impact on the global economy and industrial sectors. Business...
Journal Articles
Engineering, Construction and Architectural Management (2022) 29 (3): 1218–1240.
Published: 13 April 2021
... management processes. Design/methodology/approach This study used a project management maturity approach to develop a measurement model of PCS success. The key elements in this model have been identified using the Fuzzy Analytic Hierarchy Process (FAHP) method to analyze data from a case study involving...
Journal Articles
Engineering, Construction and Architectural Management (2016) 23 (3): 369–384.
Published: 16 May 2016
... are: first, assess the ERM maturity in a CCF; second, visualize the ERM maturity assessment results; third, provide action plans for improving the ERM implementation along the maturity continuum; and finally, generate a printable ERM maturity assessment report. Design/methodology/approach – Microsoft...
