Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Numerical simulation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Impact of time-based variability on planning reliability in construction projects: analysis of production management systems
Available to Purchase
Engineering, Construction and Architectural Management (2026) 33 (4): 3284–3307.
Published: 06 February 2025
...William León; Jose Guevara; Nelly P. Garcia-Lopez Purpose This research article proposes a quantitative method for analyzing planning reliability and risk evaluation in construction projects through probabilistic numerical simulation models. The aim is to assess the combined time-based variability...
Journal Articles
The mechanical deformation characteristics of the internal structure of large diameter shield tunnel in different construction stages
Available to Purchase
Engineering, Construction and Architectural Management (2025) 32 (4): 2190–2209.
Published: 14 December 2023
... vehicle loads at four different construction stages (prefabricated box culvert installation, curved lining cast-in-place, lane slab installation and pavement structure casting) was analyzed through field tests and ABAQUS (finite element analysis software) numerical simulation. Findings Heavy...
