Skip to Main Content
Keywords: Prefabricated building systems
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2018) 25 (2): 134–152.
Published: 19 March 2018
..., which makes it very different from production. The aim of this research is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble ETO prefabricated building systems. This research is relevant due to the need to make the design process...

or Create an Account

Close Modal
Close Modal