Keywords: Production control
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2006) 13 (5): 438–450.
Published: 01 September 2006
... success factors, which were subsequently categorised as “Events” that had to take place at a macro level, or issues requiring “Tools” at a micro level. © Emerald Group Publishing Limited 2006 Critical success factors Health and safety Integration Construction industry Production...
Journal Articles
Engineering, Construction and Architectural Management (2002) 9 (3): 284–291.
Published: 01 March 2002
... is emerging in the architectural/engineering/construction (AEC) industry. Its first module is production control, dedicated to the management of work flow between specialists. A new production control system, termed the ‘Last Planner’ system, has been successfully applied both to construction and design...

or Create an Account

Close subscription notice
Close access options