Skip to Main Content
Keywords: Project control
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (3): 1621–1642.
Published: 20 October 2023
... through the ratio of payment amounts to budgeted costs. The schedule performance index (SPI= BCWP/BCWS) is generally used to measure conformance to actual progress. In summary, between the contractor and the client, a cost-based S-curve is an easy tool to use for project control; it can also be easily...
Journal Articles
Engineering, Construction and Architectural Management (2022) 29 (6): 2233–2244.
Published: 02 June 2021
... for the new generation of project schedule analysis tools that are better informed by available knowledge and data, and hence, more reliable and useful. © Emerald Publishing Limited 2021 Emerald Publishing Limited Licensed re-use rights only Project scheduling Project control Decision support...
Journal Articles
Engineering, Construction and Architectural Management (2022) 29 (2): 896–915.
Published: 18 March 2021
...Amirali Shalwani; Brian Lines Purpose The Project Management Body of Knowledge recommends the use of issue logs as a best practice to minimize the potential project cost and schedule growth. Although the broader topic of project control has been widely studied in the construction literature...
Journal Articles
Engineering, Construction and Architectural Management (2014) 21 (1): 94–110.
Published: 14 January 2014
... linear scheduling formulation to support project control decisions. Design/methodology/approach – The proposed framework uses e-mail technology to facilitate detailed tracking of daily as-built events of all parties through bidirectional communication between site and head office. It also provides...

or Create an Account

Close Modal
Close Modal