Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Renegotiation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (9): 3876–3894.
Published: 26 April 2022
... ratio between the government and the private sector under different degree of fairness concern. Design/methodology/approach Renegotiation is a mechanism to provide flexibility and make up for incompleteness of PPP contracts. However, the threshold value of risk redistribution ratio and negotiation...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (8): 3674–3695.
Published: 15 February 2022
...Xiaowei Feng; Jiming Cao; Guangdong Wu; Kaifeng Duan Purpose Frequent renegotiations within public-private partnership (PPP) have been recognised and affect project efficiency. Literature has focussed on diverse issues associated with renegotiation within PPP, especially in Latin America...
Journal Articles
Engineering, Construction and Architectural Management (2019) 26 (6): 1004–1023.
Published: 01 March 2019
...Amira Shalaby; Amr Hassanein Purpose Public private partnership contracts tend to have longer contract durations compared to other conventional procurement methods. A contract renegotiation becomes inevitable in most of the cases. The renegotiation process usually develops a number of scenarios...
