Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Resource allocation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management 1–26.
Published: 21 April 2026
...Rakesh Acharya; Mayank Yadav; Vikas Thakur Purpose This paper discusses the degree to which the project planning practices relate to construction delays, in three fundamental dimensions, namely, the planning quality, efficiency of resource allocation and the mitigation of risks associated...
Journal Articles
Engineering, Construction and Architectural Management (2026) 33 (4): 3308–3331.
Published: 11 March 2025
...Hisham Noori Hussain Al-Hashimy; Jinfang Yao Purpose The study examines the effect on the impact of electronic accounting information systems (EAIS) in the field of construction project management, focussing on cost control (CC), time management (TM) and resource allocation (RA). Also, it examines...
Journal Articles
Engineering, Construction and Architectural Management (2026) 33 (4): 2916–2947.
Published: 21 January 2025
...Shayan Nikoukar; Mehdi Tavakolan Purpose This research aims to address the challenge of inefficient decision-making in site layout planning and resource allocation for construction projects. Existing approaches often rely on mathematical models that produce unrealistic results or encounter...
