Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Resources
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Buffer allocation in construction projects: a disruption mitigation approach
Available to Purchase
Engineering, Construction and Architectural Management (2024) 31 (10): 3946–3972.
Published: 30 March 2023
...-effective buffering and backup strategies by prioritizing project activities and their required resources. Originality/value This paper develops a risk-informed buffer allocation method that differs from those already available. The simultaneous pursuit of the probability and impact of disruptions...
Journal Articles
Identification of optimal size resources for a repetitive housing construction
Available to Purchase
Engineering, Construction and Architectural Management (2000) 7 (4): 347–361.
Published: 01 April 2000
...M. DHANASEKAR Deployment of optimal size of resources is a key issue in repetitive construction projects. This paper describes a simulation model based on queuing theory for the resource scheduling of a real repetitive housing project involving 320 dwelling units constructed in East Delhi, India...
Journal Articles
Breakwater construction: an effective method for industrial waste utilization
Available to Purchase
Engineering, Construction and Architectural Management (1999) 6 (2): 145–154.
Published: 01 February 1999
... between different resources. © MCB UP Limited 1999 Breakwater Construction Industrial waste Productivity Reuse of waste materials Resources Simulation Engineering, Construction and Architectural Management 1999 6 | 2, 145-154 Breakwater construction: an effective method for industrial...
Journal Articles
Environmental sustainability in the delivery of affordable housing in South Africa
Available to Purchase
Engineering, Construction and Architectural Management (1997) 4 (1): 23–39.
Published: 01 January 1997
... incorporate: minimisation of resource use; maximisation of reuse of resources; maximisation of use of renewable and recycled resources; use of non‐toxic materials; protection of nature; achievement of quality criteria; and promotion of labour intensive methods, skills training and capacity enhancement...
