Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-20 of 21
Keywords: Risk
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Journal Articles
A system dynamics model for analyzing BIM technology application risk in small and medium-sized construction enterprises
Available to Purchase
Engineering, Construction and Architectural Management 1–37.
Published: 25 May 2026
...' BIM technology application risks and develop a risk analysis approach to provide strategic support for SMEs' BIM technology adoption. Design/methodology/approach This study identifies 31 risk factors for SMEs adopting BIM technology from five aspects: investment, technology, application...
Includes: Supplementary data
Journal Articles
Direct and indirect effect of risk on construction supply chain in disruption era: a service-oriented view
Available to PurchaseAn Thi Binh Duong, Thang Duc Ta, Dung Quang Truong, Thinh Gia Hoang, Hiep Pham, Thu-Hang Hoang, Huy Truong Quang
Engineering, Construction and Architectural Management (2026) 33 (4): 2995–3024.
Published: 07 February 2025
...An Thi Binh Duong; Thang Duc Ta; Dung Quang Truong; Thinh Gia Hoang; Hiep Pham; Thu-Hang Hoang; Huy Truong Quang Purpose This study analyses the direct and indirect impacts of risks on the service-oriented construction supply chain and its resilience during disruptions. Design/methodology...
Journal Articles
Impact of time-based variability on planning reliability in construction projects: analysis of production management systems
Available to Purchase
Engineering, Construction and Architectural Management (2026) 33 (4): 3284–3307.
Published: 06 February 2025
...William León; Jose Guevara; Nelly P. Garcia-Lopez Purpose This research article proposes a quantitative method for analyzing planning reliability and risk evaluation in construction projects through probabilistic numerical simulation models. The aim is to assess the combined time-based variability...
Journal Articles
An integrated risk assessment method for cross-regional mega construction projects
Available to Purchase
Engineering, Construction and Architectural Management (2024) 31 (6): 2369–2391.
Published: 03 January 2023
...Pengcheng Xiang; Xin Xia; Xianya Pang Purpose The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project (CMCP). Furthermore, this paper aims to confirm the core risk source...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (2): 833–852.
Published: 26 October 2021
...Hung Duy Nguyen; Quang Nhat Huu Do; Laura Macchion Purpose Risks are considered a significant obstacle to Green Building (GB) development and have recently received significant attention from both construction practitioners and academics. This study aimed to identify critical GB risks and explore...
Journal Articles
Investigating the significance of risks in BOT transportation projects in Vietnam
Available to Purchase
Engineering, Construction and Architectural Management (2020) 27 (6): 1401–1425.
Published: 09 March 2020
...Phuong Thi Le; Nicholas Chileshe; Konstantinos Kirytopoulos; Raufdeen Rameezdeen Purpose The Built Operate Transfer (BOT) model has been increasingly used in transportation investments in Vietnam. However, there is still an inadequacy of risk management applications in these projects and lack...
Journal Articles
A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects
Available to Purchase
Engineering, Construction and Architectural Management (2017) 24 (1): 40–60.
Published: 16 January 2017
..., calendar duration, and risk registers. It quantifies the confidence in those strategies using a Monte Carlo and a multi-dimensional joint confidence limit (JCL) simulation platform. Findings n of workflows and their interdependencies. Also, the platform results show that the deviation between...
Journal Articles
A practical approach in clarifying legal drafting: Delphi and case study in Malaysia
Available to Purchase
Engineering, Construction and Architectural Management (2016) 23 (5): 610–621.
Published: 19 September 2016
... 17 11 2015 26 01 2016 © Emerald Group Publishing Limited 2016 Emerald Group Publishing Limited Licensed re-use rights only Malaysia Risk Information Contracts Disputes Contract law Clause 11.0 of PAM 2006 was selected as the example for the restructured contract...
Journal Articles
Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China
Available to Purchase
Engineering, Construction and Architectural Management (2015) 22 (6): 622–643.
Published: 16 November 2015
... performance. This system is considered to be valuable in promoting sustainable practices in China, where plans for urbanization have been established. However, the adoption of IBS in China is extremely limited. Potential risks exist and affect the attitudes of practitioners toward the use of this system...
Journal Articles
Significant risk factors associated with facilities management (FM) outsourcing: A study on Nigeria’s public hospitals
Available to Purchase
Engineering, Construction and Architectural Management (2015) 22 (6): 771–796.
Published: 16 November 2015
...Dubem I. Ikediashi; Stephen O. Ogunlana Purpose – The purpose of this paper is to extend the body of knowledge on healthcare facilities management (FM) by investigating the risks associated with outsourcing of FM services in hospitals. Design/methodology/approach – The paper relied on two...
Journal Articles
Risk perception and propensity in bid/no-bid decision-making of construction projects
Available to Purchase
Engineering, Construction and Architectural Management (2015) 22 (1): 2–20.
Published: 19 January 2015
...Yong Qiang Chen; Su Juan Zhang; Li Sha Liu; Jia Hu Purpose – Making the right bid/no-bid decision is critical to the success and development of construction contracting enterprises. Decision makers’ personal characteristics, such as risk perception and propensity, have great impact on bid/no-bid...
Journal Articles
Exploring critical delivery selection risk factors for transportation design and construction projects
Available to Purchase
Engineering, Construction and Architectural Management (2014) 21 (6): 631–647.
Published: 17 November 2014
...Dai Q. Tran; Keith R. Molenaar Purpose – The purpose of this paper is to investigate the impact of risk on the project delivery selection process of three primary methods in use in the USA, including design-bid-build (DBB); design-build (DB); and construction manager/general contractor (CMGC...
Journal Articles
Managing the health risks of extreme weather events by managing hospital infrastructure
Available to Purchase
Engineering, Construction and Architectural Management (2014) 21 (1): 4–32.
Published: 14 January 2014
...Martin Loosemore; Vivien Chow; Denny McGeorge Purpose – A predicted increase in climate change-related extreme weather events will present hospitals with new health-related and physical risks which were not originally anticipated in building and infrastructure designs. Markus et al.'s...
Journal Articles
Fine‐tuning the value and cost of capital of risky PPP infrastructure projects
Available to Purchase
Engineering, Construction and Architectural Management (2013) 20 (4): 406–419.
Published: 28 June 2013
...Andreas Wibowo; Hans Wilhelm Alfen Purpose The present paper aims to introduce a new methodology taking risk behavior of decision maker into account to fine‐tune the value of a risky public‐private‐partnership (PPP) project and the corresponding cost of capital based on the target rate of return...
Journal Articles
A contractor's classification of owner payment practices
Available to Purchase
Engineering, Construction and Architectural Management (2013) 20 (1): 29–45.
Published: 04 January 2013
... relationships. Originality/value This paper represents an original approach, and an original contribution to contractor pre‐tendering risk analysis practices, and an extension to contractor claim‐payment analysis. David G. Carmichael can be contacted at: D.Carmichael@unsw.edu.au © Emerald Group...
Journal Articles
Method and tools for building maintenance plan arbitration
Available to Purchase
Engineering, Construction and Architectural Management (2011) 18 (4): 343–362.
Published: 05 July 2011
... and the associated tools to elaborate a building maintenance plan considering the complexity of the facility management. Design/methodology/approach The risk notion can be a solution to handle the complexity. Specialists may specify each decision in terms of risk form in order to purchase (reflecting...
Journal Articles
Assessment of risks in high rise building construction in Jakarta
Available to Purchase
Engineering, Construction and Architectural Management (2003) 10 (1): 43–55.
Published: 01 February 2003
...Djoen San Santoso; Stephen O. Ogunlana; Takayuki Minato Risk is inherent in every construction project, especially complex projects like high rise buildings. It is helpful to understand the significant risks in order to anticipate their possible negative effects on projects. This research...
Journal Articles
Forecasting construction materials suppliers' financial turnover
Available to Purchase
Engineering, Construction and Architectural Management (2000) 7 (3): 221–231.
Published: 01 March 2000
.... The statistical technique of multivariate‐discriminant analysis (MDA) is used. Predictive accuracy of the models is tested on an independent, hold‐out sample of 10 suppliers' characteristics. It is found that ‘risk‐taking’ suppliers who protect themselves from bad debt by using insurance; suppliers who employ...
Journal Articles
Risk and risk management in construction: a review and future directions for research
Available to Purchase
Engineering, Construction and Architectural Management (1998) 5 (4): 339–349.
Published: 01 April 1998
...P.J. EDWARDS; P.A. BOWEN The literature on construction and project risk management published during the period from 1960 to 1997 is reviewed and analysed to identify trends and foci in research and practice. This analysis is used to identify gaps and inconsistencies in the knowledge and treatment...
Journal Articles
The New Engineering Contract: principles of design and risk allocation
Available to Purchase
Engineering, Construction and Architectural Management (1995) 2 (3): 197–208.
Published: 01 March 1995
... to implement the design principles are outlined. Emphasis is given to the way in which the procedures are intended to stimulate good management of contracts. The final section of the paper deals with risk allocation and management in NEC. The way in which the choice of contract strategy influences risk...
1
