Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Risk factor
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Risk accumulation assessment method for building construction based on complex network
Available to Purchase
Engineering, Construction and Architectural Management (2025) 32 (3): 1522–1545.
Published: 16 October 2023
... method of building construction. Design/methodology/approach Authors analyzed 419 accidents investigation reports on building construction. In total, 39 risk factors were identified by accidents analysis. These risk factors were combined with 245 risk evolution chains. Based on those, Gephi software...
Journal Articles
Analysis on risk factors related delay in PCPs
Available to Purchase
Engineering, Construction and Architectural Management (2023) 30 (10): 4609–4644.
Published: 04 July 2022
...Ying Zhao; Wei Chen; Zhuzhang Yang; Zongliang Li; Yong Wang Purpose Risk factors related delay hinder the schedule performance of most construction projects in the world. It is a critical challenge to realize the advantages of prefabricated construction projects (PCPs) under the negative effect...
Journal Articles
Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China
Available to Purchase
Engineering, Construction and Architectural Management (2015) 22 (6): 622–643.
Published: 16 November 2015
... interviews for consistency. A questionnaire survey is conducted to quantify the significance of these risks. Cronbach’s coefficient α is employed to measure the internal consistency among the risk factors. The survey results are further analyzed using three case studies. Findings – The top...
