Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-10 of 10
Keywords: South Africa
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Investigating the root causes of community disruptions in South African construction projects using an unexplored approach
Available to Purchase
Engineering, Construction and Architectural Management (2025)
Published: 16 June 2025
.... These disruptions caused by crime groups may impact infrastructure delivery if not curbed. This study investigates the perceived root causes and measures to mitigate community disruption of construction projects in South Africa. Design/methodology/approach This study adopted a qualitative research design...
Journal Articles
Adoption challenges of sensing technologies in construction project management in sub-Saharan African countries
Available to Purchase
Engineering, Construction and Architectural Management (2026) 33 (2): 1629–1648.
Published: 09 December 2024
... approach using structured questionnaires. The questionnaire link was sent to construction professionals in Nigeria, Ghana and South Africa, of which 120 were responded. Data received were analysed using the Statistical Package for Special Science (SPSS) to generate mean scores and the Kruskal–Wallis test...
Journal Articles
Critical factors influencing the failure of joint ventures in the South African construction industry: a confirmatory factor analysis approach
Available to PurchaseMatthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Donald Chiyangwa, Ayodeji Emmanuel Oke
Engineering, Construction and Architectural Management (2024) 31 (4): 1678–1695.
Published: 13 December 2022
... as the instrument for data collection. Respondents for the study were built environment professionals in Gauteng province in South Africa. Data elicited from respondents were analyzed using a four-pronged process which included descriptive statistics, one sample t-test, exploratory factor analysis...
Journal Articles
Developing effective 4IR leadership framework for construction organisations
Available to Purchase
Engineering, Construction and Architectural Management (2021) 28 (5): 1377–1396.
Published: 25 November 2020
... framework that was conceptualised. The hypothesised relationships from the framework were tested using a survey of 416 senior construction executives across the nine provinces of South Africa. Design/methodology/approach To achieve the study objectives, an online survey was sent to construction firms...
Journal Articles
Structuring architectural competitions as a competitive procurement process
Available to Purchase
Engineering, Construction and Architectural Management (2021) 28 (4): 886–907.
Published: 21 July 2020
... universities in South Africa (SPU and UMP) into a public procurement process with contractual outcomes. Design/methodology/approach A case study was designed to examine (1) the procurement and contractual aspects of the two-stage proposal procedure within a public procurement context; (2) the challenges...
Journal Articles
Language and communication issues in HIV/AIDS intervention management in the South African construction industry: Interview survey findings
Available to Purchase
Engineering, Construction and Architectural Management (2019) 26 (6): 962–988.
Published: 28 February 2019
...Peter Edwards; Paul Bowen Purpose Effective communication is a key factor in presenting Human Immunodeficiency Virus/Acquired Immune Deficiency Syndrome (HIV/AIDS) awareness and prevention campaigns, and delivering treatment programmes, particularly in South Africa where different ethnic groups...
Journal Articles
Workplace stress among construction professionals in South Africa : The role of harassment and discrimination
Available to Purchase
Engineering, Construction and Architectural Management (2013) 20 (6): 620–635.
Published: 11 November 2013
...Paul Bowen; Peter Edwards; Helen Lingard Purpose – The discrimination/harassment experiences of survey respondents in different construction professional groups in South Africa is compared, and the relationship between harassment/discrimination and perceived work stress is examined. Design...
Journal Articles
Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa
Available to Purchase
Engineering, Construction and Architectural Management (2008) 15 (5): 423–439.
Published: 05 September 2008
... capacity through reverse logistics, the following case study was conducted on seven sites in Cape Town, South Africa from July to November, 2005. The solution may lie in the utilisation of the spare capacity of construction traffic through application of the reverse logistics concept. The concept...
Journal Articles
Job satisfaction of South African quantity surveyors
Available to Purchase
Engineering, Construction and Architectural Management (2008) 15 (3): 260–269.
Published: 02 May 2008
... claim to experience high levels of job satisfaction. This result may be explained by the significance of discrimination on the basis of race reported here. Job satisfaction Professional services Work design South Africa Quantity surveying Employee satisfaction has become a major...
Journal Articles
Marketing and architects in South Africa
Available to Purchase
Engineering, Construction and Architectural Management (2003) 10 (6): 402–412.
Published: 01 December 2003
... the firm’s image to the intended market. Finally, methods of building that image of the firm in the professional circles as well as in the public’s eye are to be established. Architecture Marketing strategy Marketing opportunities South Africa In the architectural profession, the use...
