Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Time-cost trade-off
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (7): 4852–4886.
Published: 13 May 2024
... to tackle the challenges posed by time-cost trade-off (TCTO) problems. This objective is achieved through the integration of the multi-verse optimizer (MVO) with opposition-based learning (OBL), thereby introducing a groundbreaking methodology in the field. Design/methodology/approach The paper aims...
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (6): 4051–4073.
Published: 26 March 2024
...-use rights only Uncertainty theory Gain coefficient Multi-objective programming models Multi-project resource-constrained project scheduling problem Time-cost trade-off Human resource optimization The unexpected outbreak of COVID-19 has significantly challenged project management...
Journal Articles
Engineering, Construction and Architectural Management (2021) 28 (10): 3346–3367.
Published: 27 January 2021
... be leveraged in several areas such as quantity takeoff, scheduling, sustainability and facility management. The main objective of this research is to establish a model for automated schedule generation using BIM and to solve the time–cost trade-off problem (TCTP) resulting from the various scenarios offered...
Journal Articles
Engineering, Construction and Architectural Management (2018) 25 (8): 1053–1074.
Published: 01 August 2018
... model to find the optimum solution. Design/methodology/approach In the first step, a 5D simulation model is developed that includes time, cost and geometrical information of a project. Then, time-cost trade-off analysis was carried out to distinguish optimum schedule. The schedule was imported...
