Engineering, Construction and Architectural Management (2025) 32 (2): 1032–1052.
Published: 08 September 2023
... Project scheduling Differential evolution Meta-heuristic algorithm Time–cost trade-off problem Optimization Ultraploidy Duration of a project shortens and total overhead costs decrease if critical paths are completed earlier than its normal duration. This increases the direct costs...