Article navigation

IMPERIAL COLLEGE has now placed the official order for its 100kW Consort II research and training reactor with GEC (Engineering) Ltd. This reactor, which has been specially designed by GEC in collaboration with the College's Nuclear Power Group, will be installed at the College's field station at Silwood Park, near Ascot.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal