Skip to Main Content
Article navigation
Purpose

This paper aims to report upon the further development of a hybrid application programming interface (API) plug-in to building information modelling (BIM) entitled confined spaces safety monitoring system “CoSMoS”. Originally designed to engineer-out environmental hazards associated with working in a building’s confined spaces (during the construction phase of a building’s life-cycle), this second generation version is expanded upon to use archival records to proactively learn from data generated within a sensor network during the building’s operations and maintenance (O&M) phase of asset management (AM).

Design/methodology/approach

An applied research methodological approach adopted used a two-phase process. In phase one, a conceptual model was created to provide a “blueprint map” to integrate BIM, sensor-based networks and data analytics (DA) into one integral system. A literature review provided the basis for the conceptual model’s further development. In phase two, the conceptual model was transposed into the prototype’s development environment as a proof of concept using primary data accrued from a large educational building.

Findings

An amalgamation of BIM, historical sensor data accrued and the application of DA demonstrate that CoSMoS provides an opportunity for the facilities management (FM) team to monitor pertinent environmental conditions and human behaviour within buildings that may impact upon occupant/worker safety. Although working in confined spaces is used to demonstrate the inherent potential of CoSMoS, the system could readily be expanded to analyse sensor-based network’s historical data of other areas of building performance, maintenance and safety.

Originality/value

This novel prototype has automated safety applications for FM during the asset lifecycle and maintenance phase of a building’s O&M phase of AM. Future work is proposed in several key areas, namely, develop instantaneous indicators of current safety performance within a building; and develop lead indicators of future safety performance of buildings.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal