Purpose

This paper aims to provide architecture, engineering, construction and facilities management (AEC/FM) practitioners with a guiding tool for overcoming the challenges affecting their performance in adaptive reuse project.

Design/methodology/approach

Literature review was conducted to comprehend the challenges affecting the AEC/FM performance during the implementation of adaptive reuse projects. A case study was conducted on an adaptively reused building, located in Saudi Arabia. The case study building was converted from a bookstore into an amusement center. Document review of the as-built drawings, and a structured interview with the project manager were conducted. The study concluded with the development of AEC/FM practical guidelines, pertaining to the different involved domains.

Findings

This study indicated that the potential challenges are interrelated among the three domains. These challenges pertained to the spatial, legislative, technical, administrative and operational aspects. The findings emphasized the vital role of the integration among the AEC/FM domains, at the early project planning phases. Based on the findings, three sets of AEC/FM guidelines were developed.

Research limitations/implications

Theoretically, to the best of the authors’ knowledge, this is the first study that provides a case-specific investigation of the challenges affecting the AEC/FM performance in adaptive reuse projects.

Practical implications

The developed practical guidelines could potentially enhance the AEC/FM performance in future adaptive reuse projects.

Originality/value

This study contributes to the practice of adaptive reuse projects through providing practical guidelines for mitigating the challenges that affect the AEC/FM performance in these projects.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal