Article navigation
Purpose

The purpose of this paper is to illustrate an uncertain programming model for scheduling of preventive maintenance (PM) actions. The PM scheduling, in which PM actions are performed under fixed intervals, is solved by grey systems theory.

Design/methodology/approach

The paper applied the grey evaluation method based on triangular whitenization weight functions which includes two classes: endpoint evaluation method and center-point evaluation method.

Findings

Two methods give the same results based on endpoint and center-point triangular whitenization weight functions. For validation, the results were compared by Cassady’s method.

Originality/value

The scheduling of PM is crucial in reliability and maintenance engineering. Hundreds of parts compose complex machines that require replacement and/or repairing. It is helpful to reduce the outage loss on frequent repair/replacement parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options