Focuses on the use of analytic hierarchy process (AHP) to prioritize different forms of information. Identification of the key information may help better allocation of resources for a construction project. Various forms of information and their associated activities may critically affect the project, which have to be carefully dealt with for enhancing the project performance. Essentially, when some of these forms of information have to be produced and managed by more sophisticated information technology, the more we know about their importance level, the better we could allocate our investment in the construction project. In general, this study reveals that managerial information is equally as important as technical information. This implies that an overall information system should incorporate the technologies and techniques for generating and maintaining both types of information.
Article navigation
1 May 2001
This article was originally published in
Information Management & Computer Security
Research Article|
May 01 2001
Information priority‐setting for better resource allocation using analytic hierarchy process (AHP)
Eddie W.L. Cheng;
Eddie W.L. Cheng
The Hong Kong Polytechnic University, Kowloon, Hong Kong
Search for other works by this author on:
Heng Li
Heng Li
The Hong Kong Polytechnic University, Kowloon, Hong Kong
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-5805
Print ISSN: 0968-5227
© MCB UP Limited
2001
Information Management & Computer Security (2001) 9 (2): 61–70.
Citation
Cheng EW, Li H (2001), "Information priority‐setting for better resource allocation using analytic hierarchy process (AHP)". Information Management & Computer Security, Vol. 9 No. 2 pp. 61–70, doi: https://doi.org/10.1108/09685220110388827
Download citation file:
1,513
Views
New and popular articles
Suggested Reading
Reliability metric for information systems based on customer requirements
International Journal of Quality & Reliability Management (November,1997)
Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA
Engineering, Construction and Architectural Management (September,2015)
Predicting construction cost index using fuzzy logic and machine learning in Jordan
Construction Innovation: Information Process Management (January,2024)
Customer requirements based ERP customization using AHP technique
Business Process Management Journal (August,2014)
Key criteria for selecting green suppliers for construction projects in the UAE
Journal of Financial Management of Property and Construction (April,2021)
Related Chapters
Fuzzy Set Theory and Extensions for Multi-criteria Decision-making in Construction Management
Fuzzy Hybrid Computing in Construction Engineering and Management: Theory and Applications
General Introduction
A Digital Path to Sustainable Infrastructure Management: Emerging Tools for the Construction Industry
Digital Transformation for Sustainable Infrastructure Management
A Digital Path to Sustainable Infrastructure Management: Emerging Tools for the Construction Industry
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
