Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Structural timber
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Air Gap Method: drying of a concrete slab on ground construction
Available to Purchase
Structural Survey (2010) 28 (4): 281–299.
Published: 30 August 2010
... detached houses built by the risky method of construction used in the last decades of the twentieth century. Tord af Klintberg can be contacted at: tord.klintberg@byv.kth.se © Emerald Group Publishing Limited 2010 Construction materials Concrete slabs Drying Property Structural timber...
Journal Articles
Developing future energy performance standards for UK housing: The St Nicholas Court project – Part 1
Available to Purchase
Structural Survey (2003) 21 (4): 119–130.
Published: 01 October 2003
... and cost optimised transition is for the necessary development work to begin immediately, not when regulation changes. © MCB UP Limited 2003 Housing Energy Performance criteria Conservation Regulation Structural timber The seeds of this project were contained in a report...
