Open figure viewer
Describes a model of a hierarchical planning system to provide a comprehensive approach to the complex production planning and scheduling problem. The model supplies a link between long‐term and short‐term planning; the three tiers of the hierarchy implement: long‐term inventory planning on a cost minimization basis; shorter‐term production planning; and daily sequencing. Emphasizes efficient processing and transmission of information.
This content is only available via PDF.
© MCB UP Limited
1993
You do not currently have access to this content.
