Purpose

The aim of the paper is to conduct a comprehensive review and bibliometric analysis of the relationship between leadership and corporate social responsibility (CSR). It seeks to investigate the impact of different leadership styles on CSR outcomes and organizational performance while exploring key themes such as transformational leadership, ethical leadership and responsible leadership, and their influence on CSR initiatives and stakeholder engagement.

Design/methodology/approach

The study examines a vast array of literature from 1980 to 2023 across various disciplines using the Scopus database. The analysis focuses on identifying the mediating role of organizational factors, such as ethical culture and intellectual capital, in the relationship between leadership styles and CSR outcomes.

Findings

The study highlights the significance of responsible leadership in promoting CSR practices and enhancing firm performance. It identifies the influence of transformational, ethical and responsible leadership styles on CSR initiatives and stakeholder engagement, emphasizing the importance of an ethical culture and intellectual capital as mediating factors.

Originality/value

This study provides a theoretical and practical implications of the intersection between leadership and CSR. By synthesizing an extensive literature and conducting a bibliometric analysis, it offers valuable insights and suggests directions for future research, thereby contributing to the understanding of how leadership styles impact CSR initiatives and organizational performance.

The emergence of globalization, liberalization and international trade has elevated the importance of corporate social responsibility (CSR), necessitating greater transparency and corporate citizenship (Chomvilailuk and Butcher, 2024; Barriga and Escandon‐Barbosa, 2024). Traditionally, governments were solely responsible for enhancing living conditions, but societal needs now exceed governmental capacity. Consequently, businesses are increasingly expected to play a role in addressing societal challenges, leading progressive corporations to actively engage in CSR initiatives (Kavadis et al., 2024). However, this presents a strategic dilemma for businesses, as they must balance immediate concerns of survival and competition with achieving social and environmental sustainability (Maside‐Sanfiz et al., 2024; Bag et al., 2024). Modern organizations recognize the importance of addressing economic, political and social aspects of society (Nugroho et al., 2024).

Bowen (1953) defines the social responsibility of businessmen as their obligation to adopt policies, make decisions and undertake actions that align with society’s goals and values. CSR is defined as a process involving the ethical and responsible treatment of a corporation’s stakeholders and has evolved over time (Hopkins, 1998, 2006). CSR goes beyond mere legal compliance, emphasizing a firm’s consideration for stakeholders beyond shareholders (Ledi et al., 2024; Freeman, 1999). Corporate practices associated with CSR can positively impact various aspects of operations, including environmental management, sustainable development, corporate reputation, financial performance, customer loyalty and stakeholder relationships. Therefore, it is essential for leaders and managers to actively engage in CSR measures as integral parts of their roles in leading or managing organizations (Hakimian et al., 2017).

Leadership refers to influencing and directing a group toward desired outcomes (Benmira and Agboola, 2021; Robbins, 1996; Stogdill, 1950). Bass (1990) expanded this definition to include the interactive process among group members. Top leaders have significant influence over decision-making processes, shaping corporate culture and long-term strategies due to their strategic capabilities (Graham et al., 2022; Zhao et al., 2023). In the context of strategic objectives like CSR, top management teams play a crucial role in policymaking and implementation (Zhao et al., 2023). Their strategic vision and organizational direction guide CSR initiatives, highlighting the importance of leadership in promoting CSR.

Proactive leadership is pivotal for achieving CSR and sustainability goals, transforming companies into socially responsible entities (Zhang et al., 2022). The approach to sustainable business ethics critiques neoclassical economics, advocating for a broader interdisciplinary perspective on corporate norms and values (Rendtorff, 2019). Research suggests that starting CSR initiatives from the perspectives of leaders and managers enhances productivity (Castaldo et al., 2023; D’Amato et al., 2009). Numerous studies emphasize leadership’s crucial role in promoting CSR initiatives (Gu and Liu, 2022; Wu et al., 2021; Du et al., 2013; Waldman et al., 2006b). However, leadership can hinder CSR intentions and implementation if perceived as a threat (Christensen et al., 2014). Understanding previous research on the relationship between CSR and leadership is vital because both concepts are closely linked to business legitimacy, which is fundamental for a company’s ability to operate and prosper in society (Zhao et al., 2023; Rendtorff, 2020). Leadership plays a critical role in shaping and guiding a company’s CSR initiatives (Rendtorff, 2020). Moreover, stakeholder theory emphasizes prioritizing not only shareholders’ interests but also those of other stakeholders (Rendtorff and Bonnafous-Boucher, 2016). Leadership must balance these expectations to serve long-term interests (Groves and La Rocca, 2012a, 2012b; Maak, 2007). This balancing act is crucial in stakeholder management, as highlighted in the Encyclopedia of Stakeholder Management (Rendtorff and Bonnafous-Boucher, 2023), which provides a comprehensive exploration of the various dynamics at play. Additionally, exploring the leadership-CSR relationship enhances understanding of both objectives (Zhao et al., 2023). A bibliometric analysis of CSR and leadership is essential to identify emerging trends, fill research gaps and adapt to global challenges like climate change and social justice. By integrating insights from various disciplines, bibliometric analysis provides a comprehensive understanding that traditional reviews may overlook (Ramsawak et al., 2024). It highlights influential scholarship, guiding future research and practice by pinpointing key contributions to the field. Additionally, it offers valuable insights for policymakers and business leaders, helping them align leadership strategies with CSR goals to enhance corporate legitimacy and societal impact.

Understanding the intersection of leadership and CSR is paramount for promoting sustainable business practices and societal well-being. This intersection explores how leadership behaviors and decisions shape corporate responsibility initiatives, thereby influencing organizational culture, stakeholder relationships and long-term performance. By understanding the mechanisms through which leadership influences CSR, this review empowers organizations to cultivate ethical leadership practices that prioritize societal impact alongside financial success. Moreover, it underscores the transformative potential of leadership in driving positive change, emphasizing the imperative for leaders to champion CSR as a strategic imperative rather than a peripheral concern. In essence, exploring this intersection facilitates the cultivation of responsible leadership paradigms that align organizational objectives with broader societal needs, fostering a more equitable and sustainable future.

Reviewing the literature on the relationship between leadership and CSR is crucial for several reasons. First, it helps to understand the impact of leadership styles and behaviors on CSR initiatives within organizations. By identifying effective leadership practices that promote CSR, companies can enhance their social responsibility efforts, leading to positive outcomes for both the organization and its stakeholders. Second, this review fills a significant gap in the domain by synthesizing existing research and highlighting key findings and trends. It provides a comprehensive overview of the current state of knowledge on leadership and CSR, allowing scholars and practitioners to identify areas for further research and development. Therefore, the main objective of this study is to synthesize and analyze the existing literature to develop a comprehensive understanding of research trends regarding the relationship between leadership and CSR. This study is specifically designed to address four pivotal research questions:

RQ1.

What are the publication trends in leadership and CSR research?

RQ2.

Which authors, countries and institutions have made the most significant contributions to the field of leadership and CSR, and what are the most influential sources, and publications?

RQ3.

What predominant themes have surfaced in leadership and CSR research?

RQ4.

What gaps exist in the literature, and what potential directions can future research take in this domain?

Few literature review papers have been conducted on this topic to date. Notably, Zhao et al. (2023), Saha et al. (2020), Lis (2019), Mazutis and Zintel (2015), Strand (2011) and Marshall (2007) have made significant contributions to this area, and their findings are discussed further in detail. Zhao et al.’s (2023) research is the most recent, covering the period from 1994 to 2020. However, this study differs by extending into the postpandemic era, offering more timely and valuable insights. Saha et al. (2020) conducted a systematic review of the literature analyzing the link between CSR and ethical leadership, covering the period from 1958 to 2016, with a smaller sample size of 114 papers (n = 114). Similarly, Mazutis and Zintel’s (2015) study, which used narrative and systematic review methods, had a limited sample size of 95 papers covering the period from 1976 to 2014. Strand (2011) and Marshall (2007) conducted narrative reviews of the literature, with Strand (2011) focusing on the link between various leadership styles and CSR, while Marshall (2007) examined CSR through a gendered lens. Hence, this study provides a comprehensive systematic review of papers exploring the link between CSR and leadership, with a particular focus on the postpandemic era. It contributes to recent developments in this research domain, which, to the best of our knowledge, have not been addressed in previous studies.

After the introductory section, this review study unfolds as follows. Section 2 explores a comprehensive literature review on the intersection of leadership and CSR. Section 3 outlines the research methodology employed in this study. Subsequently, in Section 4, the findings derived from the literature review are presented, integrating both bibliometric and content analyses of pertinent scholarly papers. Section 5 suggests themes derived from the study’s findings. Following that, Section 6 discusses potential research topics for future exploration. Finally, the last section (Section 7) concludes by identifying the theoretical and practical implications of the study’s findings and discussing the limitations of this review.

The field of CSR and leadership has garnered substantial scholarly interest, as indicated by the findings of bibliometric analysis (Zhao et al., 2023). The growing attention to this intersection has resulted in significant contributions from numerous authors, shaping the evolution of this field. Particularly noteworthy is the substantial increase in publications on CSR-leadership since 2009, underscoring the rising interest and academic research focus on this subject. Numerous researchers have explored the relationship between various leadership styles and CSR, with ethical leadership emerging as a key factor. Studies have consistently shown that ethical leadership positively impacts CSR initiatives within organizations, consequently improving organizational performance (Alkhadra et al., 2022; Kim and Thapa, 2018; Nguyen et al., 2021; Williams and Seaman, 2016). For instance, a systematic review by Saha et al. (2020) proposed a conceptual framework highlighting the positive impact of ethical leadership, driven by personal values, on CSR and its direct and indirect influence on firm performance. Various studies have examined the role of ethical leadership and CSR in various organizational outcomes, including financial performance (Bouichou et al., 2022a, 2022b; Nguyen et al., 2019), organizational culture (Alkhadra et al., 2022; Pasricha et al., 2018), firm reputation (Nguyen et al., 2021; Zhu et al., 2014) and employees’ turnover intention (Lin and Liu, 2017; Nejati et al., 2021). These studies suggest that organizations can improve performance and other work-related factors by adopting an ethical leadership approach and prioritizing CSR strategies. Furthermore, responsible leadership has been identified as playing a crucial role in the effective implementation of CSR within organizations (Amir et al., 2022). Moin et al. (2024) found that green transformational leadership (GTL) directly influences task performance, with CSR mediating the positive relationship between GTL and performance in the Chinese hospitality industry.

The concept of leadership style arises from the recognition that companies must address the interests of multiple stakeholders, representing a convergence of ethics, leadership and CSR (Antunes and Franco, 2016; Maak and Pless, 2006). Responsible leadership, a prominent theme in academic literature, is of significant importance within organizations. It enables the enhancement of various aspects, such as job performance, financial performance, organizational commitment and employees’ positive behaviors, through the effective implementation of CSR initiatives (Bouichou et al., 2022a, 2022b; Castro-González et al., 2022; Javed et al., 2020; Piñeros Espinosa, 2022). Moreover, research in this field has examined the impact of other leadership styles, such as transformational leadership, authentic leadership and servant leadership, on the successful implementation of CSR within organizations. These leadership styles have been linked to positive outcomes at both individual and organizational levels across a range of sectors (Besieux et al., 2018; Iqbal et al., 2018; Mallén Broch et al., 2020; Sayed and Ansari, 2020; van de Bunt and Salomons, 2018; Yang and Kim, 2018).

Gender in leadership emerges as a crucial factor influencing CSR and organizational outcomes. Ali et al. (2023) found that leadership gender diversity, characterized by the inclusion of both male and female leaders offering diverse perspectives, positively influenced CSR. Additionally, CSR played a mediating role in the relationship between leadership gender diversity and organizational performance. Female leaders, in particular, have been linked to the enhancement of CSR practices within organizations. Alonso-Almeida et al. (2017) observed that female leaders demonstrated greater adaptability and effectiveness in driving company sustainability, particularly in Spain, through transformational and dual leadership styles. Furthermore, CSR reports signed by female leaders were found to be more readable and fostered a greater sense of solidarity, which positively correlated with organizations’ future social performance (Harjoto et al., 2020). Similarly, Hyun et al. (2022) found a positive relationship between CSR ratings and increased female participation in top executive teams, which led to a heightened focus on addressing CSR concerns. However, Tichenor et al. (2022) reported a different finding, where, although leadership gender diversity increased nonpersonnel Environmental, social and governance (ESG) scores, a higher number of female executives was associated with lower nonpersonnel ESG scores. This may be due to pressures on female leaders to prioritize financial performance over ESG considerations. Wang et al. (2024) conducted a meta-analysis of 318 samples to consolidate findings on the influence of executive and board attributes on CSR. They found that board characteristics have a stronger relationship with CSR than executive characteristics, with limited moderating effects from country-level managerial discretion and the strength of investor protection.

While the COVID-19 pandemic has had detrimental impacts on the global economy and societies, it presents a remarkable opportunity for businesses to transition toward a more genuine and real-world form of CSR, actively contributing to resolving crucial global social and environmental issues (Freze et al., 2023). Despite extensive studies on the pandemic’s adverse economic effects (Nicola et al., 2020; Naseer et al., 2023; Maheshwari and Maheshwari, 2021), limited attention has been given to its optimistic aspects, including the resurgence of concepts related to social responsibility, sustainability and green practices (Jian et al., 2020). Furthermore, there is a paucity of research examining the relationship between leadership, CSR and organizational outcomes during and postpandemic (Freze et al., 2023; Pham and Vu, 2023). Freze et al. (2023) found that the presence of a director or general manager who was also the owner of the organization positively influenced the effective implementation of CSR initiatives in the Czech Republic and the Russian Federation postpandemic. Additionally, Pham and Vu (2023) discovered that public value commitment leadership (PVCL) positively impacted accountants’ productivity and CSR during the pandemic period and the new normal in the Vietnamese public sector, with CSR mediating the relationship between PVCL and accountant productivity.

A comprehensive literature review was conducted adhering to the preferred reporting items for systematic reviews and meta-analyses (PRISMA) guidelines (Page et al., 2021), using the Scopus database, recognized as one of the largest databases (Chadegani et al., 2013) to identify relevant papers in the field of leadership and CSR. This review focused on exploring publication patterns, influential authors, institutional affiliations, research methodologies and emerging themes (Maheshwari et al., 2024) within the intersection of leadership and CSR. Additionally, the aim is to identify topics studied by scholars and highlight gaps in the existing literature to inform future research directions. This review considered papers published from 1980 to 2023 to encompass both past and contemporary perspectives on research trends within the study’s domain.

The search query used different combinations of keywords such as “Leadership,” “Leader,” “Corporate social responsibility” and “CSR” in the article title, abstract and keywords, yielding an initial pool of 973 documents. Subsequently, the search was refined to include only articles written in English and was further narrowed to exclude conference papers and book chapters, resulting in 690 documents. Following the abstract review, an additional 79 articles were excluded because they were not directly related to leadership and CSR, resulting in a final sample size of n = 611 articles for the analysis conducted in this review (as in Figure 1).

Figure 1.

Articles selection process following PRISMA guidelines

Figure 1.

Articles selection process following PRISMA guidelines

Close modal

To ensure the validity and trustworthiness of this systematic review, several measures were implemented. The transparent and comprehensive search strategy, guided by PRISMA (Figure 1), involved clearly defined inclusion and exclusion criteria (as mentioned above) to minimize selection bias and ensure robust coverage of relevant literature. Furthermore, the search and selection process were carefully evaluated to enhance the reliability of study selection and reduce bias. Each step of the review process was meticulously documented, ensuring the methodology’s transparency and replicability, thereby contributing to the robustness and trustworthiness of the study’s findings (Maheshwari and Kha, 2023). The Bibliography Shiny tool from R software was used to address the first two research questions, while VOSviewer was used to answer the third research question of our paper.

In this section, a total of 611 identified articles focusing on leadership and CSR research domains were used for further analysis using performance analysis and science mapping methods.

4.1.1 Trend in the research field (RQ1).

Descriptive statistical analysis was conducted to offer an overview of publication trends spanning from 1980 to 2023 to answer the first research question of this study (as shown in Table 1). According to the descriptive findings, a total of 611 documents were sourced from 315 outlets, comprising 604 articles and 122 single-authored documents. The publications demonstrated an annual growth rate of 8.69% during this period. On average, each document accrued approximately 31 citations, with a cumulative total of 39,211 references cited across the selected publications. Concerning author collaboration, each document exhibited an average of three coauthors, with an international coauthorship rate of 28.97%.

Table 1.

Main information of data using descriptive statistics

DescriptionResults
Main information about data 
Timespan1980:2023
Sources (journals, books, etc.)315
Documents611
Annual growth rate %8.69
Document average age6.2
Average citations per doc30.8
References39,211
Document contents 
Keywords plus (ID)752
Author’s keywords (DE)1,693
Authors 
Authors1,509
Authors of single-authored docs113
Authors collaboration 
Single-authored docs122
Coauthors per doc2.72
International coauthorships %28.97
Document types 
Article604
Others7

Source(s): Author’s own work

Figure 2 illustrates the number of documents published on the subject of leadership and CSR from 1980 to 2023. The initial scholarly paper in this area emerged in 1980, followed by a 19-year hiatus until academic researchers began showing interest in the topic around 2000. Although progress remained sluggish over the subsequent decade, with only 10% of papers published during this period, there was a notable surge in publications since 2010. The majority of articles (90%) were published within the past 14 years, indicating a significant increase in research activity. Particularly in the past six years, there has been a pronounced uptick in research interest, with 57% of total articles published during this period. This suggests that the field of leadership and CSR is still relatively novel and gaining traction, with ongoing growth anticipated in future publications. Overall, the upward trend in publications reflects a growing acknowledgment among researchers of the importance of this research domain over time.

Figure 2.

Total number of publications from 1980 to 2023

Figure 2.

Total number of publications from 1980 to 2023

Close modal

4.1.2 Regions of research (RQ2).

RQ2 of this study is explored through the following three subsections and Section 4.2.1. Figure 3 illustrates the top 10 countries with the highest number of publications on the intersection of leadership and CSR from 1980 to 2023, collectively constituting 68% of total publications. The USA leads with the majority of papers (324), followed by China, the UK and Australia. This concentration of research underscores the focused nature of this field, with a select few countries taking the forefront. Notably, most of these countries are developed nations. However, the research topic has garnered significant global attention, with studies conducted in a total of 72 countries. This global collaboration may be attributed to the trends of globalization and increased recognition of CSR’s importance in the context of international business.

Figure 3.

Number of papers by countries

Figure 3.

Number of papers by countries

Close modal

4.1.3 Publication sources (RQ2).

Figure 4 displays the top 10 impactful journals featuring a substantial number of publications on the intersection of leadership and CSR, encompassing a total of 611 relevant papers across 315 journals. These top 10 journals accounted for 187 articles, constituting approximately 31% of the total papers. The Journal of Business Ethics emerged as the leading journal in this domain, with 56 published articles. Following closely were Sustainability (Switzerland), Social Responsibility Journal and Corporate Social Responsibility and Environmental Management. These journals are characterized by their thematic focus on ethical considerations, sustainable development and the social and environmental responsibilities of businesses.

Figure 4.

Top 10 journals by number of publications

Figure 4.

Top 10 journals by number of publications

Close modal

4.1.4 Contributors impacting the research field (RQ2).

Table 2 presents the top 20 influential authors who have made significant contributions to the research on leadership and CSR from 1980 to 2023. Their impact on the field was assessed based on several metrics, including the h-index, g-index, m-index, total citations and number of publications. The h-index or Hirsch index, is a widely recognized metric that evaluates an author’s research output and influence by considering the number of papers that have received at least h citations. Introduced by Egghe (2006), the g-index offers a more comprehensive measure of citation performance by considering the cumulative citations of the top “g” articles. Additionally, the m-index, derived from the h-index, provides insight into an author’s productivity over time by indicating the h-index per year since their first publication.

Table 2.

Top 20 most impactful authors according to h-index and number of publications

Authorsh_indexg_indexm_indexTotal citationsNo. of
publications
Year of first
publication
Pless NM660.35361962007
Ahmad N551.66712252021
Groves KS550.38527352011
Maak T440.33338142012
Nurunnabi M440.66714942018
Voegtlin C440.33346342012
Waldman DA440.2221,15442006
Benn S330.21436632010
Chen Y-RR340.37442014
Huang SYB330.61932019
Hung-Baesecke C-JF340.37442014
Larocca MA330.23124032011
Li X330.3757732016
Lindgreen a330.23121532011
Manz CC330.23113732011
Panagopoulos NG330.27341132013
Samad S3416042021
Stahl GK330.2512832012
Swaen V330.23128932011
Tuan LT330.2517532012

Source(s): Author’s own work

Nicola M. Pless emerges as a prominent scholar in the field, publishing the highest number of papers (6) along with the top h-index and g-index of 6. Following closely is Naveed Ahmad, with five published papers and an h-index and g-index of 5, along with the highest m-index of 1.667, indicating consistent productivity over time. Noteworthy is the substantial impact of Waldman’s publications, accumulating the highest number of citations (1,154 citations). Waldman’s work predominantly focuses on the role of leadership in CSR engagement and the CSR values of businesses (Waldman et al., 2006a, 2006b). Additionally, authors from diverse disciplines and backgrounds have contributed significantly to the field of leadership and CSR research, enriching its breadth and depth.

Table 3 presents the top 20 institutions and their respective countries which have contributed the most publications on the topic of leadership and CSR from 1980 to 2023. Pepperdine University in the USA is leading, with an impressive 12 publications, closely followed by Swinburne University of Technology in Australia, with 11 published papers. Additionally, institutions such as Hong Kong Baptist University in Hong Kong, along with Tsinghua University, Wuhan University and Zhejiang University in China, have also made substantial contributions to the research literature, each with nine publications. Notably, the majority of institutions listed in the table come from the USA and China, indicating their significant role in advancing research in this field.

Table 3.

Top 20 affiliations publishing in the domain

AffiliationCountryArticles
Pepperdine UniversityUSA12
Swinburne University of TechnologyAustralia11
Hong Kong Baptist UniversityHong Kong9
Tsinghua UniversityChina9
Wuhan UniversityChina9
Zhejiang UniversityChina9
Arizona State UniversityUSA8
Macquarie UniversityAustralia8
University of Central PunjabPakistan8
Comsats University IslamabadPakistan7
Ghent UniversityBelgium7
University of the PunjabPakistan7
Wageningen UniversityThe Netherlands7
Indiana UniversityUSA6
Macau University of Science and TechnologyMacao6
Pennsylvania State UniversityUSA6
Prince Sultan UniversitySaudi Arabia6
Renmin University of ChinaChina6
Universidad autónoma De MadridSpain6
University of MichiganUSA6

Source(s): Author’s own work

4.2.1 Citation network analysis (RQ2).

Citation network analysis serves as a method to gauge a paper’s impact by assessing the frequency with which it has been cited in other works (McLaren and Bruner, 2022). This analytical approach enables the identification of the most influential publications within a research domain, elucidating the interconnectedness between various works when one paper cites another (Donthu et al., 2021). Scholars frequently use citation network analysis in bibliometric review papers to scrutinize citation patterns within a specific field, providing insights into the flow of ideas and the prominence of key contributions (Martinez-Perez et al., 2020; Mihalic et al., 2021).

Local citations indicate the number of citations that a paper receives from other works within the same field or research network (Batista-Canino et al., 2023). Table 4 highlights the top 20 papers with the highest local citations, with Waldman et al.’s (2006a) study leading the list with 73 local citations. The studies garnering high local citations predominantly examine the influence of leaders and various leadership styles adopted by top management teams, including transformational, transactional and responsible leadership, on CSR implementation in organizations (Du et al., 2013; Groves and LaRocca, 2011; Maak et al., 2016; Waldman et al., 2006a, 2006b).

Table 4.

Top 20 locally cited articles

DocumentYearLocal citationsGlobal citations
Waldman DA, 2006 J Manage Stud200673481
Groves KS, 2011 J Bus Ethics201131173
Christensen LJ, 2014, Acad Manage Perspect201429173
Du S, 2013 J Bus Ethics201329141
Angus-Leppan T, 2010 J Bus Ethics201028125
Pless NM, 2012, Acad Manage Perspect201225156
Waldman DA, 2006 J Int Bus Stud200625474
Voegtlin C, 2012 J Bus Ethics201222213
Maak T, 2016 J Manage Stud201619147
Wu L-Z, 2015 J Bus Ethics201518144
Zhu Y, 2014, Asia Pac J Manage201415194
Afsar B, 2018, Corp Soc Responsib Environ Manage201813125
Kim M-S, 2018, Sustainability20181348
Groves KS, 2011 J Bus Ethics-A20111346
Saha R, 2020, Corp Soc Responsib Environ Manage20201295
Manzoor F, 2019, Sustainability20191271
De Roeck K, 2018 J Bus Ethics201812145
Pasricha P, 2018 J Bus Ethics20181157
Vlachos PA, 2013 J Bus Ethics201311211
Khan HUR, 2018, Corp Soc Responsib Environ Manage20181054

Source(s): Author’s own work

Global citations, in contrast, indicate the number of times a paper is cited by other papers in different disciplines and diverse backgrounds (Batista-Canino et al., 2023). Table 5 presents the top 20 globally cited publications, with the most cited paper being Jo and Harjoto (2011), accumulating 709 global citations. This research examined the impact of corporate governance and firm value on CSR activities and engagement in the business sphere. Following closely is the study by Jenkins and Yakovleva (2006) with 594 citations, followed by two studies by Waldman (Waldman et al., 2006a, 2006b) with global citations of 474 and 481, respectively.

Table 5.

Top 20 globally cited articles

DocumentYearLocal
citations
Global
citations
Jo H, 2011 J Bus Ethics20113709
Jenkins H, 2006 J Clean Prod20061594
Waldman DA, 2006 J Manage Stud200673481
Waldman DA, 2006 J Int Bus Stud200625474
Epstein MJ, 2001, Long Range Plann20013467
Mcguinness PB, 2017 J Corp Financ20177339
Gillan SL, 2021 J Corp Financ20212261
Yin J, 2012 J Bus Ethics20120251
Azapagic A, 2003, Process Saf Environ Prot Trans Inst Chem Eng Part B20030228
Voegtlin C, 2012 J Bus Ethics201222213
Vlachos PA, 2013 J Bus Ethics201311211
Zhu Y, 2014, Asia Pac J Manage201415194
Metcalf L, 2013 J Bus Ethics20136188
Garavan TN, 2010, Adv Dev Hum Resour20104177
Groves KS, 2011 J Bus Ethics201131173
Christensen LJ, 2014, Acad Manage Perspect201429173
Mallin CA, 2011, Account Bus Res20113172
Mcshane L, 2012 J Bus Ethics20129167
Klettner A, 2014 J Bus Ethics20141167
Pless NM, 2007 J Bus Ethics20070167

Source(s): Author’s own work

4.2.2 Cocitation analysis (RQ3).

Cocitation, as defined by Small (1973), refers to the frequency of two papers being cited together. The occurrence of cocitation suggests a conceptual similarity, indicating a shared subject matter between the two publications (Hjørland, 2013). Through cocitation analysis, researchers can identify the underlying knowledge base within a particular research field and uncover similarities among the authors cited in papers within the domain (Bang et al., 2023). The primary objective of cocitation analysis is to discern relationships among cited publications and facilitate content analysis. This method illuminates the interconnectedness of ideas and concepts within the scholarly literature, providing valuable insights into the intellectual structure and evolution of a research field over time.

The cocitation analysis was conducted using VOSviewer, with a minimum citation threshold of 50 for each author. The outcomes suggested the presence of five research clusters, encompassing a total of 95 authors cocited in a network of 611 papers. Cluster 1 consisted of 37 authors, Cluster 2 with 37 authors, Cluster 3 with 8 authors, Cluster 4 with 7 authors and Cluster 5 with 6 authors. These clusters are visually distinguished by the colors red, green, blue, yellow and purple, as depicted in Figure 5. Waldman emerged as the most impactful author in the leadership – CSR research field, cited 306 times, closely followed by Carroll with 271 citations. Papers authored by renowned researchers within Cluster 1 primarily focused on the roles of leadership, CSR and their effects on various components in organizational contexts. This cluster also contained authors whose works presented frameworks and conceptual models related to CSR within organizational contexts. Numerous studies explored strategic management aspects and examined CSR strategies along with their implications for organizations.

Figure 5.

Cocitation authors analysis by VOSviewer

Figure 5.

Cocitation authors analysis by VOSviewer

Close modal

In Cluster 2, a predominant concentration was placed on ethical leadership and organizational justice, with some authors’ works addressing research methodology concepts such as common method biases. Avolio and Bass, prominent authors in Cluster 3, have been leading in the research domain of leadership, known for their influential transformational leadership theory and the full range of leadership model. Other researchers in this cluster had papers discussing organizational image and identification. Finally, the most cited works of authors in Clusters 4 and 5 addressed responsible leadership and the impact of CSR on stakeholders in organizations. These clusters contributed significantly to the understanding of leadership and CSR dynamics within organizational settings.

Table 6 presents the top ten publications identified through PageRank analysis. This method serves as an additional means to assess the authors’ impact within the research field, highlighting the prominence of papers frequently cited by influential works. PageRank analysis originated from the algorithm initially developed by Google to rank Web pages in search results. In bibliometrics, it has been adapted to evaluate the importance and weightings of a citation network. The fundamental principle behind the PageRank algorithm aligns closely with the concept of “journal influence,” considering not only the number of citations among journals but also the significance of the citing journal. According to the findings, the study conducted by McWilliams and Siegel (2001) achieved the highest PageRank index. Their research primarily focused on examining the effects of CSR initiatives on the financial and organizational performance of firms. Additionally, the paper by Waldman et al. (2006a, 2006b) attained the second-highest PageRank index, indicating its significant influence within the academic realm. This study used the framework of transformational leadership theory to investigate the crucial role of chief executive officers (CEOs) in their firms’ involvement in CSR practices. Moreover, this research garnered the highest number of local citations and was among the studies with the highest global citations, as evidenced by Tables 4 and 5 presented earlier.

Table 6.

Cocitation analysis identifying PageRank

DocumentClusterBetweennessClosenessPageRank
Mcwilliams A. 2001179.614661040.0147058820.044611997
Waldman D.A. 2006284.730111430.0149253730.044126397
Freeman R.E. 1984126.662181990.0142857140.035424308
Orlitzky M. 2003120.190189790.0140845070.034182031
Carroll A.B. 1979256.604295740.0147058820.026911508
Turker D. 2009–1345.67683260.0142857140.025831752
Brown ME 2005327.242107380.0138888890.025752066
Margolis J.D. 200315.1796102050.0126582280.025294611
Bass B.M. 1985214.546731630.0135135140.024016707
Waddock S.A. 199711.2959424740.0119047620.023327315

Source(s): Author’s own work

4.2.3 Cooccurrence analysis (RQ3).

Cooccurrence analysis involves investigating two keywords appearing together in an article, indicating a linkage between the respective concepts (Sedighi, 2016), and this along with cocitation analysis (in Section 4.2.2) is used for addressing the third research question of the study with identification of three major themes in Section 5. This analytical technique has been widely employed by researchers across multiple disciplines, as demonstrated by the works of Lis (2019) and Yoopetch et al. (2022), who have leveraged it as a significant method for exploring the relationship of interconnected concepts. The objective of cooccurrence analysis is to determine thematic themes and effectively synthesize the diverse contents found in scholarly articles concerning the domain of leadership and CSR research.

Based on the cooccurrence analysis of authors’ keywords, Figure 6 presents a network visualization showing the connections among various terms. This analysis considered keywords that appeared a minimum of 5 times, resulting in a total of 55 items distributed across 7 clusters. Notably, the most frequently occurring keywords within the related research topics were “corporate social responsibility” (318 times), followed by “leadership” (84 times), “sustainability” and “CSR” appearing 52 times each, “ethical leadership” (42 times), “corporate social responsibility (CSR)” (36 times), “responsible leadership” (29 times), “transformational leadership” (25 times), “ethics” (23 times), “sustainable development” (22 times), “business ethics” (16 times), “corporate governance” (15 times), “China” (14 times), “social responsibility” (13 times) and “organizational identification” (12 times). Most of the keywords within the top 15 frequently occurring terms revolve around the themes of leadership or leadership styles (“leadership,” “ethical leadership,” “responsible leadership” and “transformational leadership”), CSR (“corporate social responsibility,” “sustainability,” “ethics” and “sustainable development”) and organizational contexts (“business ethics,” “corporate governance” and “organizational identification”), implying a significant linkage between leadership and CSR in organizational settings. This observation also highlights that the connection among variables has been identified and examined by a considerable number of studies since 1980.

Figure 6.

Cooccurrence analysis by VOSviewer

Figure 6.

Cooccurrence analysis by VOSviewer

Close modal

The analysis of each cluster reveals distinct thematic areas within the intersection of leadership and CSR (which are discussed in detail in Section 5). Cluster 1 encompasses 11 keywords primarily addressing corporate governance and accountability. Cluster 2 focuses on the exploration of transformational and transactional leadership, along with keywords related to sustainability and sustainable development. Keywords in Cluster 3 revolve around ethical leadership, responsible leadership, servant leadership and the topic of business ethics and values. Cluster 4 aligns with the overarching theme of stakeholders’ engagement and corporate sustainability. In Cluster 5, the keywords center around environmental sustainability and organizational performance. The main topics of keywords in Cluster 6 include leadership’s responsibility, innovation and organizational performance. Finally, Cluster 7 represents thematic areas of crisis response, such as COVID-19, and the social impact. This comprehensive analysis highlights the diverse dimensions of research within the leadership and CSR domain, spanning corporate governance, leadership styles, ethical considerations, stakeholder engagement, environmental concerns and crisis management.

The identification of clusters was carried out in Sections 4.2.2 and 4.2.3, and subsequent major themes were developed based on these clusters by integrating the most influential papers. Three key themes emerged from the analysis of the most influential papers (as presented in Section 4.2.3, Table 6), which are discussed herein to address the third research question of this study.

The first theme revolves around the effects of ethical leadership and CSR on various organizational and employee factors. This theme delves into how ethical leadership practices and CSR initiatives influence organizational culture, employee behavior, job performance and other related factors. The second theme focuses on the impacts of responsible leadership and CSR on stakeholder engagement and innovative sustainability-oriented factors. It explores how responsible leadership approaches and CSR strategies contribute to enhancing stakeholder relationships, fostering sustainability initiatives and driving innovation in organizations. The third theme centers on transformational leadership and CSR’s influence on sustainable development, employee well-being and organizational outcomes. This theme examines how transformational leadership styles and CSR activities intersect to promote sustainable development goals, enhance employee satisfaction and improve overall organizational performance.

In the following sections, a content analysis is conducted on the existing literature to further explore and discuss the implications of these themes in the context of leadership and CSR research.

Numerous studies in the domain of leadership and CSR have explored the intricate relationship among different leadership styles, CSR and various organizational and employee factors. A thorough content analysis reveals that a significant portion of influential studies has concentrated on unraveling the role of ethical leadership in propelling CSR initiatives within organizations. Ethical leadership is defined as the demonstration of normatively appropriate behavior through personal actions and interpersonal relationships, coupled with the cultivation of such behavior through effective mutual communication, reinforcement and decision-making processes (Brown et al., 2005). The ethical leadership of management teams has been found to foster the congruence of ethical values among employees, thereby nurturing a socially conducive environment within organizations (Wu et al., 2015). Moreover, CSR aligns with the value congruence inherent in ethical leadership, signifying organizations’ recognition of their ethical and philanthropic duties toward stakeholders alongside their pursuit of economic prosperity and adherence to legal compliance (Zhu et al., 2014). Ethical leaders are driven to enhance their organization’s environmental, social and ethical performance to meet stakeholder expectations (Zhu et al., 2014).

Brown et al. (2005) underscore that ethical leadership places a more explicit emphasis on evaluating the ethical attributes of a leader compared to transformational leadership. Indeed, prior research has shed light on the pivotal role of ethical leadership as a foundational element for the successful implementation of CSR initiatives in organizations (Tian et al., 2015; Yin and Zhang, 2012). Various studies, including those by Saha et al. (2020), Kim and Thapa (2018), Nguyen et al. (2021) and Williams and Seaman (2016) have underscored the significant impact of ethical leadership on CSR and organizational performance. Ethical leadership has also been observed to moderate the relationship between CSR and firm performance (Bouichou et al., 2022b; Zhu et al., 2014). Furthermore, several researchers have delved into the vital role of ethical leadership in enhancing CSR initiatives through organizational culture (Pasricha et al., 2018; Ullah et al., 2022; Wu et al., 2015).

On the employee level, ethical leadership and CSR have been found to positively influence socially responsible behaviors, attitudes and engagement among employees (Choi et al., 2015; De Roeck and Farooq, 2018; Nejati et al., 2019). Ethical leaders play a pivotal role in shaping their followers’ understanding and acknowledgment of the significance of ethics and CSR in augmenting organizational effectiveness (Choi et al., 2015). Moreover, ethical leadership and CSR have been linked to employees’ organizational citizenship behavior (Gao and He, 2017; Tourigny et al., 2019), job satisfaction, organizational engagement (Lin and Liu, 2017; Nejati et al., 2021; Tran et al., 2023) and job performance (AfTable et al., 2022).

In today’s business landscape, leaders are increasingly expected to not only deliver economic results but also to consider their social and environmental impact (Baranova and Meadows, 2017). Responsible leadership is characterized as a relational and influential process between leaders and stakeholders, emphasizing accountability in creating organizational value (Maak et al., 2016). Leaders play a pivotal role in shaping organizational vision, mission, strategic direction, CSR initiatives and stakeholder interactions, thereby influencing how businesses manage their societal responsibilities (Maak et al., 2016). Responsible leaders actively cultivate sustainable relationships with stakeholders to pursue shared objectives and contribute to the broader welfare of society (Schinzel, 2018).

Previous research highlights the crucial role of responsible leadership in fostering organizational sustainability by effectively addressing societal, environmental and economic concerns. Responsible leaders demonstrate an adeptness at identifying and addressing the needs and interests of stakeholders, using relational, governing and orientational perspectives to meet their demands and contribute to societal welfare (Amir et al., 2022). They fulfill their social responsibility practically by prioritizing customer needs, ensuring employee equality and actively participating in community and network activities (Simunaniemi et al., 2023).

Moreover, responsible leadership and CSR initiatives significantly impact various employee factors, including CSR engagement (Luu, 2023; Maak et al., 2016), green behavior (He et al., 2021), work engagement (Dong and Zhong, 2022; Yasin, 2021) and organizational citizenship behavior (Bouichou et al., 2022a). Fostering a proactive and committed workforce, which enhances overall organizational efficiency, necessitates promoting responsible leadership, demonstrating genuine intentions behind CSR initiatives and ensuring equitable treatment among employees (Dong and Zhong, 2022). Additionally, Castro-González et al. (2019) found that responsible leadership positively influenced salespeople’s creativity through the mediation of CSR perception. This suggests that sales leaders can cultivate a creative work environment by engaging in responsible leadership practices and effectively communicating CSR strategies. However, responsible leadership was also found to negatively moderate the relationship between CSR reputation and performance. Overemphasizing stakeholder values may lead socially responsible firms to excessively engage in CSR initiatives, which could potentially undermine organizational performance (Javed et al., 2020).

Scholarly inquiry into the intersection of leadership and CSR has recognized the profound influence of transformational leadership and CSR on sustainability, various organizational components and employee dynamics in business contexts. Transformational leadership entails inspiring subordinates by articulating and promoting a shared vision, motivating them to transcend personal interests for the collective benefit of the team and the organization (Avolio and Bass, 1991; Bass, 1985). These leaders demonstrate advanced moral development, considering the interests of all stakeholders and actively engaging in organizational governance guided by universal ethical principles (Graham, 1995).

As a distinctive contribution of this paper, a thematic analysis was performed on the identified papers for this study. The thematic map presented in Figure 7 provides insights into prevailing research topics from 1980 to 2023. Initially, between 1980 and 2005, scholarly attention primarily focused on CSR and business ethics. From 2006 to 2012, the research landscape advanced, witnessing the emergence of themes such as responsible leadership, management education and transformational leadership. Another phase of theme progression occurred from 2013 to 2020, with the inclusion of corporate governance. In recent years (2021–2023), the domain of CSR research has expanded to incorporate authentic leadership, organizational identification and ethical leadership. This evolution reflects the dynamic nature of research within the intersection of leadership and CSR, demonstrating shifts in emphasis and the exploration of new dimensions over time.

Figure 7.

Thematic map of publications from 1980 to 2023

Figure 7.

Thematic map of publications from 1980 to 2023

Close modal

Previous research has shown that transformational leadership plays a crucial role in enhancing environmental performance (Hussain et al., 2022; Niazi et al., 2023; Tosun et al., 2022), fostering green innovation (Sobaih et al., 2022), and promoting CSR and environmental engagement within organizations (Goffnett, 2018; Waldman et al., 2006a). Through environmentally specific transformational leadership, organizations can inspire employees to embrace pro-environmental values by effectively communicating a clear environmental vision, resulting in increased green advocacy among employees (Crucke et al., 2022). Furthermore, the integration of transformational leadership and CSR practices within organizations has been linked to enhanced employee job performance (Hongdao et al., 2019; K and Ranjit, 2020; Manzoor et al., 2019), increased work commitment (Chandra et al., 2023; Sayed and Ansari, 2020), organizational citizenship behavior (Alshihabat and Atan, 2020; Goswami et al., 2018; Groves and La Rocca, 2012a, 2012b; Srour et al., 2020), adoption of pro-environmental behavior (Deng et al., 2022; Soni, 2022) and positive stakeholder perceptions of CSR (Groves and La Rocca, 2012a, 2012b, 2011). Consequently, these factors contribute to favorable outcomes at both individual and organizational levels. Several studies have also examined the substantial impact of transformational leadership, CSR and firm performance (Khan et al., 2018; Kusi et al., 2021; Manzoor et al., 2019), organizational innovation (Khan et al., 2018; Sobaih et al., 2022) and organizational identification (Allen et al., 2017; Chandra et al., 2023; Goswami et al., 2018).

In this section, the last question of this study (RQ4) is addressed by providing the avenues for future research. A comprehensive review of the literature on leadership and CSR reveals several significant research gaps and points toward future research directions to advance theoretical knowledge, inform managerial practices and guide policy interventions aimed at promoting responsible leadership and sustainable CSR initiatives. Based on the analysis conducted in this study, the eight specific directions for future research are proposed, which are discussed next.

First, while existing studies have delved into the relationship between leadership styles and CSR in the prepandemic era, there is a pressing need for studies that examine this link in the postpandemic era. Second, existing studies have predominantly focused on a single leadership style to understand its relationship with CSR. There is a necessity for research that integrates multiple theoretical perspectives, such as transformational leadership, servant leadership and ethical leadership, to offer a more comprehensive understanding of how various leadership approaches influence CSR initiatives within organizations.

Third, future research could explore the impact of contextual factors, including organizational culture, industry characteristics and national cultural dimensions, on the relationship between leadership and CSR. Comparative studies across diverse cultural contexts could shed light on the universality or contingency of leadership-CSR dynamics. Fourth, future research studies could explore the mediating variables, such as organizational climate, employee attitudes and stakeholder perceptions, as well as moderating factors, such as firm size, industry type and environmental uncertainty, to offer valuable insights into the complexity of leadership-CSR relationships.

Fifth, to capture the dynamic nature of leadership-CSR interactions, longitudinal designs could be used to assess the temporal effects of leadership behaviors on CSR performance over time. Sixth, multilevel analyses that scrutinize leadership-CSR dynamics at both the individual and organizational levels could provide a more nuanced understanding of the mechanisms underlying these relationships. Seventh, given the evolving nature of CSR and leadership practices, future research should explore emerging trends, such as responsible leadership, sustainable innovation and stakeholder engagement, to identify innovative practices that enhance organizational sustainability and social impact.

Finally, future research could explore the ethical dimensions of leadership and CSR across various cultural contexts, acknowledging the significant role that ethics plays in shaping economic and social systems (Rendtorff, 2023). By examining ethical theories and practices in different cultures, researchers can better understand the diverse conceptions of ethics that influence leadership behaviors and CSR initiatives. This avenue is particularly important for identifying humanity-based alternatives to mainstream economic thinking, ultimately contributing to more equitable and just economic systems worldwide.

The purpose of this paper was to explore the relationship between leadership styles and CSR initiatives within organizations. Through a comprehensive review and synthesis of the literature from the studies conducted from 1980 to 2023, the findings shed light on the complex interplay between different leadership approaches and CSR outcomes, offering valuable insights for both theory and practice.

There are several theoretical implications regarding the role of leadership in driving CSR initiatives and fostering sustainable business practices. First, the integration of multiple theoretical perspectives, including transformational leadership, ethical leadership and responsible leadership, emerged as a key theme in understanding the dynamics of leadership-CRS relationships (Rendtorff, 2019). The findings suggest that effective leadership in promoting CSR goes beyond transactional behaviors and encompasses transformative processes that inspire, empower and engage employees in socially responsible actions (Rendtorff and Bonnafous-Boucher, 2023; Rendtorff and Bonnafous-Boucher, 2016). Moreover, the review highlighted the dynamic and contingent nature of leadership-CRS relationships, emphasizing the importance of contextual factors, organizational characteristics and stakeholder dynamics in shaping the effectiveness of leadership behaviors (Rendtorff, 2020). While certain leadership styles, such as transformational leadership, were found to be positively associated with CSR outcomes across different contexts, the effectiveness of leadership behaviors may vary depending on industry norms, regulatory environments and cultural dimensions. Furthermore, the identification of mediating and moderating mechanisms provided insights into the underlying processes through which leadership styles impact CSR outcomes. From organizational climate and employee attitudes to stakeholder perceptions and regulatory pressures, various factors were found to mediate or moderate the relationship between leadership and CSR, highlighting the importance of considering intraorganizational dynamics and external stakeholder influences in understanding leadership-CRS dynamics. Overall, this review suggests that effective leadership plays a critical role in shaping organizational culture, fostering stakeholder relationships and promoting responsible business practices. By integrating theoretical insights into practical strategies, organizations can enhance their leadership effectiveness, drive CSR initiatives and contribute to sustainable development goals in an increasingly complex and interconnected global business environment. Finally, this review expands beyond the postpandemic era, a deviation from previous systematic literature reviews, thus further enhancing the existing literature.

This review suggests several practical implications for organizations aiming to bolster leadership effectiveness and instill responsible CSR practices within an organization. First, investing in leadership development programs geared toward fostering transformational, ethical and responsible leadership competencies among managers and executives is crucial. These programs can include practical workshops, real-world case studies and mentorship opportunities to equip leaders with the necessary skills and attributes to motivate and empower employees to actively participate in CSR initiatives. Additionally, organizations must prioritize effective stakeholder engagement strategies characterized by transparent communication, open dialogue and collaborative partnerships. Implementing mechanisms such as regular stakeholder meetings, feedback surveys and cocreation sessions can ensure that leadership objectives align with stakeholder expectations, thereby creating trust and cooperation in CSR endeavors. Moreover, cultivating a supportive organizational culture and climate that places value on ethical conduct, social responsibility and sustainability is essential. Embedding these values into core policies, performance evaluation criteria and reward systems helps leaders create an environment conducive to CSR implementation and employee engagement. Furthermore, taking a long-term perspective and integrating CSR considerations into strategic decision-making processes is imperative. Using tools like sustainability dashboards and CSR impact assessments to monitor progress ensures the sustainability of CSR initiatives, enhancing organizational resilience, reputation and competitive advantage in an increasingly complex global landscape.

While this study has provided valuable insights, it is essential to acknowledge its limitations and identify opportunities for future research. Primarily, the study focused exclusively on papers available in the Scopus database, potentially overlooking significant contributions from other databases or publication formats. Additionally, despite efforts to ensure diversity in the selection of articles, the presence of publication bias might have influenced the findings, thus impacting their generalizability. Furthermore, the exclusion of conference papers and book chapters may have restricted the scope of the review, potentially missing out on unique perspectives and insights. Moving forward, researchers could conduct more extensive literature reviews encompassing multiple databases and languages to ensure a more comprehensive examination of the literature. Moreover, employing alternative methodologies, such as qualitative case studies or longitudinal designs, could offer deeper insights into the dynamics of leadership and CSR over time. Exploring emerging topics and trends, such as the influence of technological advancements or global events on leadership and CSR practices, would also be valuable for staying abreast of evolving organizational landscapes. By addressing these limitations and exploring new avenues for research, scholars can contribute to advancing knowledge and understanding in the field of leadership and CSR.

Aftab
,
J.
,
Sarwar
,
H.
,
Amin
,
A.
and
Kiran
,
A.
(
2022
), “
Does CSR mediate the nexus of ethical leadership and employee’s job performance? Evidence from North Italy SMEs
”,
Social Responsibility Journal
, Vol.
18
No.
1
, pp.
154
-
177
, doi: .
Ali
,
M.
,
Grabarski
,
M.K.
,
Ahmed
,
S.
and
Imtiaz
,
N.
(
2023
), “
Does leadership gender diversity drive corporate social responsibility and organizational outcomes? The role of organization size
”,
Australian Journal of Management
, Vol.
49
No.
3
, p.
31289622311606
, doi: .
Alkhadra
,
W.A.
,
Khawaldeh
,
S.
and
Aldehayyat
,
J.
(
2022
), “
Relationship of ethical leadership, organizational culture, corporate social responsibility and organizational performance: a test of two mediation models
”,
International Journal of Ethics and Systems
, doi: .
Allen
,
G.W.
,
Attoh
,
P.A.
and
Gong
,
T.
(
2017
), “
Transformational leadership and affective organizational commitment: mediating roles of perceived social responsibility and organizational identification
”,
Social Responsibility Journal
, Vol.
13
No.
3
, pp.
585
-
600
, doi: .
Alonso-Almeida
,
M. D M.
,
Perramon
,
J.
and
BagurFemenias
,
L.
(
2017
), “
Leadership styles and corporate social responsibility management: analysis from a gender perspective
”,
Business Ethics: A European Review
, Vol.
26
No.
2
, pp.
147
-
161
, doi: .
Alshihabat
,
K.
and
Atan
,
T.
(
2020
), “
The mediating effect of organizational citizenship behavior in the relationship between transformational leadership and corporate social responsibility practices: middle Eastern example/Jordan
”,
Sustainability (Switzerland)
, Vol.
12
No.
10
, doi: .
Amir
,
M.
,
Siddique
,
M.
and
Ali
,
K.
(
2022
), “
Responsible leadership and business sustainability: exploring the role of corporate social responsibility and managerial discretion
”,
Business and Society Review
, Vol.
127
No.
3
, pp.
701
-
724
, doi: .
Antunes
,
A.
and
Franco
,
M.
(
2016
), “
How people in organizations make sense of responsible leadership practices
”,
Leadership and Organization Development Journal
, Vol.
37
No.
1
, pp.
126
-
152
, doi: .
Avolio
,
B.
and
Bass
,
B.
(
1991
), “
The full range of leadership development programs: basic and advanced manuals
”,
Journal of European Industrial Training
, Vol.
15
No.
4
.
Bag
,
S.
,
Srivastava
,
G.
,
Gupta
,
S.
,
Sivarajah
,
U.
and
Wilmot
,
N.V.
(
2024
), “
The effect of corporate ethical responsibility on social and environmental performance: an empirical study
”,
Industrial Marketing Management
, Vol.
117
, pp.
356
-
370
.
Bang
,
N.P.
,
Ray
,
S.
and
Kumar
,
S.
(
2023
), “
Women in family business research—what we know and what we should know?
”,
Journal of Business Research
, Vol.
164
, p.
113990
, doi: .
Baranova
,
P.
and
Meadows
,
M.
(
2017
), “
Engaging with environmental stakeholders: routes to building environmental capabilities in the context of the low carbon economy
”,
Business Ethics: A European Review
, Vol.
26
No.
2
, pp.
112
-
129
, doi: .
Barriga
,
R.H.
and
Escandon‐Barbosa
,
D.
(
2024
), “
Synergizing board dynamics, sustainability, and strategy for international success
”,
Corporate Social Responsibility and Environmental Management
, Vol.
31
No.
4
.
Bass
,
B.M.
(
1985
),
Leadership and Performance beyond Expectations
,
Free Press
,
New York, NY
.
Bass
,
B.M.
(
1990
), “
From transactional to transformational leadership: learning to share the vision
”,
Organizational Dynamics
, Vol.
18
No.
3
, p.
1931
, doi: .
Batista-Canino
,
R.M.
,
SantanaHernández
,
L.
and
MedinaBrito
,
P.
(
2023
), “
A scientometric analysis on entrepreneurial intention literature: delving deeper into local citation
”,
Heliyon
, Vol.
9
No.
2
, p.
e13046
, doi: .
Benmira
,
S.
and
Agboola
,
M.
(
2021
), “
Evolution of leadership theory
”,
BMJ leader, leader-2020
.
Besieux
,
T.
,
Baillien
,
E.
,
Verbeke
,
A.L.
and
Euwema
,
M.C.
(
2018
), “
What goes around comes around: the mediation of corporate social responsibility in the relationship between transformational leadership and employee engagement
”,
Economic and Industrial Democracy
, Vol.
39
No.
2
, pp.
249
-
271
, doi: .
Bouichou
,
S.I.
,
Wang
,
L.
and
Feroz
,
H.M.B.
(
2022a
), “
How corporate social responsibility perceptions affect employees’ positive behavior in the hospitality industry: moderating role of responsible leadership
”,
International Review on Public and Nonprofit Marketing
, Vol.
19
No.
2
, pp.
413
-
446
, doi: .
Bouichou
,
S.I.
,
Wang
,
L.
and
Zulfiqar
,
S.
(
2022b
), “
How corporate social responsibility boosts corporate financial and nonfinancial performance: the moderating role of ethical leadership
”,
Frontiers in Psychology
, Vol.
13
, doi: .
Bowen
,
H.R.
(
1953
),
Social Responsibilities of the Businessman
,
University of Lowa press
, doi: .
Brown
,
M.E.
,
Treviño
,
L.K.
and
Harrison
,
D.A.
(
2005
), “
Ethical leadership: a social learning perspective for construct development and testing
”,
Organizational Behavior and Human Decision Processes
, Vol.
97
No.
2
, pp.
117
-
134
, doi: .
Castaldo
,
S.
,
Ciacci
,
A.
and
Penco
,
L.
(
2023
), “
Perceived corporate social responsibility and job satisfaction in grocery retail: a comparison between low-and high-productivity stores
”,
Journal of Retailing and Consumer Services
, Vol.
74
, p.
103444
.
Castro-González
,
S.
,
Bande
,
B.
and
FernándezFerrín
,
P.
(
2019
), “
Responsible leadership and salespeople’s creativity: the mediating effects of CSR perceptions
”,
Sustainability
, Vol.
11
No.
7
, p.
2053
, doi: .
Castro-González
,
S.
,
Bande
,
B.
and
VilaVázquez
,
G.
(
2022
), “
How corporate social responsibility explains salespeople’s job performance: the influence of responsible leadership
”,
Social Responsibility Journal
, doi: .
Chadegani
,
A.A.
,
Salehi
,
H.
,
Yunus
,
M.M.
,
Farhadi
,
H.
,
Fooladi
,
M.
,
Farhadi
,
M.
and
Ebrahim
,
N.A.
(
2013
), “
A comparison between two main academic literature collections: web of science and scopus databases
”,
arXiv preprint arXiv:1305.0377
.
Chandra
,
S.
,
Ghosh
,
P.
and
Sinha
,
S.
(
2023
), “
Addressing employee turnover in retail through CSR and transformational leadership
”,
International Journal of Retail and Distribution Management
, Vol.
51
No.
5
, pp.
690
-
710
, doi: .
Choi
,
S.B.
,
Ullah
,
S.M.E.
and
Kwak
,
W.J.
(
2015
), “
Ethical leadership and followers’ attitudes toward corporate social responsibility: the role of perceived ethical work climate
”,
Social Behavior and Personality: An International Journal
, Vol.
43
No.
3
, p.
353365
, doi: .
Chomvilailuk
,
R.
and
Butcher
,
K.
(
2024
), “
Enhancing employee advocacy of the firm’s corporate social responsibility (CSR) activities
”,
Asia-Pacific Journal of Business Administration
, Vol.
16
No.
4
, pp.
816
-
835
.
Christensen
,
L.J.
,
Mackey
,
A.
and
Whetten
,
D.
(
2014
), “
Taking responsibility for corporate social responsibility: the role of leaders in creating, implementing, sustaining, or avoiding socially responsible firm behaviors
”,
Academy of Management Perspectives
, Vol.
28
No.
2
, doi: .
Crucke
,
S.
,
Servaes
,
M.
,
Kluijtmans
,
T.
,
Mertens
,
S.
and
Schollaert
,
E.
(
2022
), “
Linking environmentallyspecific transformational leadership and employees’ green advocacy: the influence of leadership integrity
”,
Corporate Social Responsibility and Environmental Management
, Vol.
29
No.
2
, pp.
406
-
420
, doi: .
D’Amato
,
A.
,
Henderson
,
S.
and
Florence
,
S.
(
2009
), “
Corporate social responsibility and sustainable business: a guide to leadership tasks and functions
”,
Center for Creative Leadership
.
De Roeck
,
K.
and
Farooq
,
O.
(
2018
), “
Corporate social responsibility and ethical leadership: investigating their interactive effect on employees’ socially responsible behaviors
”,
Journal of Business Ethics
, Vol.
151
No.
4
, pp.
923
-
939
, doi: .
Deng
,
Y.
,
Cherian
,
J.
,
Ahmad
,
N.
,
Scholz
,
M.
and
Samad
,
S.
(
2022
), “
Conceptualizing the role of targetspecific environmental transformational leadership between corporate social responsibility and proenvironmental behaviors of hospital employees
”,
International Journal of Environmental Research and Public Health
, Vol.
19
No.
6
, p.
3565
, doi: .
Dong
,
W.
and
Zhong
,
L.
(
2022
), “
How and when responsible leadership facilitates work engagement: a moderated mediation model
”,
Journal of Managerial Psychology
, Vol.
37
No.
6
, pp.
545
-
558
, doi: .
Donthu
,
N.
,
Kumar
,
S.
,
Mukherjee
,
D.
,
Pandey
,
N.
and
Lim
,
W.M.
(
2021
), “
How to conduct a bibliometric analysis: an overview and guidelines
”,
Journal of Business Research
, Vol.
133
, pp.
285
-
296
, doi: .
Du
,
S.
,
Swaen
,
V.
,
Lindgreen
,
A.
and
Sen
,
S.
(
2013
), “
The roles of leadership styles in corporate social responsibility
”,
Journal of Business Ethics
, Vol.
114
No.
1
, pp.
155
-
169
, doi: .
Egghe
,
L.
(
2006
), “
Theory and practise of the g-index
”,
Scientometrics
, Vol.
69
No.
1
, pp.
131
-
152
, doi: .
Freeman
,
R.E.
(
1999
), “
Response: divergent stakeholder theory
”,
The Academy of Management Review
, Vol.
24
No.
2
, doi: .
Freze
,
T.
,
Korneev
,
A.
,
Krayneva
,
R.
,
Oruch
,
T.
,
Kandalov
,
W.
and
Strielkowski
,
W.
(
2023
), “
Business leadership and corporate social responsibility in the postCOVID era
”,
Economies
, Vol.
11
No.
3
, p.
98
, doi: .
Gao
,
Y.
and
He
,
W.
(
2017
), “
Corporate social responsibility and employee organizational citizenship behavior
”,
Management Decision
, Vol.
55
No.
2
, pp.
294
-
309
, doi: .
Goffnett
,
S.P.
(
2018
), “
Transformational leadership and environmental commitment in supply chain relationships: the mediating effect of perceived fairness
”,
International Journal of Integrated Supply Management
, Vol.
12
Nos
1/2
, p.
118
, doi: .
Goswami
,
A.
,
O’Brien
,
K.E.
,
Dawson
,
K.M.
and
Hardiman
,
M.E.
(
2018
), “
Mechanisms of corporate social responsibility: the moderating role of transformational leadership
”,
Ethics and Behavior
, Vol.
28
No.
8
, pp.
644
-
661
, doi: .
Graham
,
J.W.
(
1995
), “
Leadership, moral development, and citizenship behavior
”,
Business Ethics Quarterly
, Vol.
5
No.
1
, pp.
43
-
54
, doi: .
Graham
,
J.R.
,
Grennan
,
J.
,
Harvey
,
C.R.
and
Rajgopal
,
S.
(
2022
), “
Corporate culture: evidence from the field
”,
Journal of Financial Economics
, Vol.
146
No.
2
, pp.
552
-
593
.
Groves
,
K.S.
and
LaRocca
,
M.A.
(
2011
), “
An empirical study of leader ethical values, transformational and transactional leadership, and follower attitudes toward corporate social responsibility
”,
Journal of Business Ethics
, Vol.
103
No.
4
, pp.
511
-
528
, doi: .
Groves
,
K.S.
and
La Rocca
,
M.A.
(
2012a
), “
Responsible leadership outcomes via stakeholder CSR values: testing a valuescentered model of transformational leadership
”,
Responsible Leadership
, doi: .
Groves
,
K.S.
and
La Rocca
,
M.A.
(
2012b
), “
Does transformational leadership facilitate follower beliefs in corporate social responsibility? A field study of leader personal values and follower outcomes
”,
Journal of Leadership and Organizational Studies
, Vol.
19
No.
2
, pp.
215
-
229
, doi: .
Gu
,
F.
and
Liu
,
J.
(
2022
), “
Environmentally specific servant leadership and employee workplace green behavior: moderated mediation model of green role modeling and employees’ perceived CSR
”,
Sustainability
, Vol.
14
No.
19
, p.
11965
.
Hakimian
,
F.
,
Farid
,
H.
and
Ismail
,
M.N.
(
2017
), “
Corporate social responsibility and leadership style
”,
CSR, Sustainability, and Leadership
,
Routledge
, (
1st Ed.
), pp.
124
-
141
, doi: .
Harjoto
,
M.A.
,
Laksmana
,
I.
and
Lee
,
W.E.
(
2020
), “
Female leadership in corporate social responsibility reporting: effects on writing, readability and future social performance
”,
Advances in Accounting
, Vol.
49
, p.
100475
, doi: .
He
,
J.
,
Morrison
,
A.M.
and
Zhang
,
H.
(
2021
), “
Being sustainable: the threeway interactive effects of CSR, green human resource management, and responsible leadership on employee green behavior and task performance
”,
Corporate Social Responsibility and Environmental Management
, Vol.
28
No.
3
, pp.
1043
-
1054
, doi: .
Hjørland
,
B.
(
2013
), “
Facet analysis: the logical approach to knowledge organization
”,
Information Processing and Management
, Vol.
49
No.
2
, pp.
545
-
557
, doi: .
Hongdao
,
Q.
,
Bibi
,
S.
,
Khan
,
A.
,
Ardito
,
L.
and
Nurunnabi
,
M.
(
2019
), “
Does what goes around really comes around? The mediating effect of CSR on the relationship between transformational leadership and employee’s job performance in law firms
”,
Sustainability
, Vol.
11
No.
12
, p.
3366
, doi: .
Hopkins
,
M.
(
1998
),
A Planetary Bargain: Corporate Social Responsibility Comes of Age
,
Macmillan
,
UK
.
Hopkins
,
M.
(
2006
), “
What is corporate social responsibility all about?
”,
Journal of Public Affairs
, Vol.
6
Nos
3/4
, doi: .
Hussain
,
Y.
,
Abbass
,
K.
,
Usman
,
M.
,
Rehan
,
M.
and
Asif
,
M.
(
2022
), “
Exploring the mediating role of environmental strategy, green innovations, and transformational leadership: the impact of corporate social responsibility on environmental performance
”,
Environmental Science and Pollution Research
, Vol.
29
No.
51
, pp.
76864
-
76880
, doi: .
Hyun
,
S.
,
Kim
,
J.M.
,
Han
,
J.
and
Anderson
,
M.
(
2022
), “
Female executive leadership and corporate social responsibility
”,
Accounting and Finance
, Vol.
62
No.
3
, pp.
3475
-
3511
, doi: .
Iqbal
,
S.
,
Farid
,
T.
,
Jianhong
,
M.
,
Khattak
,
A.
and
Nurunnabi
,
M.
(
2018
), “
The impact of authentic leadership on organizational citizenship behaviours and the mediating role of corporate social responsibility in the banking sector of Pakistan
”,
Sustainability
, Vol.
10
No.
7
, p.
2170
, doi: .
Javed
,
M.
,
Rashid
,
M.A.
,
Hussain
,
G.
and
Ali
,
H.Y.
(
2020
), “
The effects of corporate social responsibility on corporate reputation and firm financial performance: moderating role of responsible leadership
”,
Corporate Social Responsibility and Environmental Management
, Vol.
27
No.
3
, pp.
1395
-
1409
, doi: .
Jenkins
,
H.
and
Yakovleva
,
N.
(
2006
), “
Corporate social responsibility in the mining industry: exploring trends in social and environmental disclosure
”,
Journal of Cleaner Production
, Vol.
14
Nos
3/4
, pp.
271
-
284
, doi: .
Jian
,
Y.
,
Yu
,
I.Y.
,
Yang
,
M.X.
and
Zeng
,
K.J.
(
2020
), “
The impacts of fear and uncertainty of COVID19 on environmental concerns, brand trust, and behavioral intentions toward green hotels
”,
Sustainability
, Vol.
12
No.
20
, p.
8688
, doi: .
Jo
,
H.
and
Harjoto
,
M.A.
(
2011
), “
Corporate governance and firm value: the impact of corporate social responsibility
”,
Journal of Business Ethics
, Vol.
103
No.
3
, pp.
351
-
383
, doi: .
K
,
J.
and
Ranjit
,
G.
(
2020
), “
Effect of transformational leadership on job performance: testing the mediating role of corporate social responsibility
”,
Journal of Advances in Management Research
, Vol.
17
No.
5
, p.
605625
, doi: .
Kavadis
,
N.
,
Hermes
,
N.
,
Oehmichen
,
J.
,
Zattoni
,
A.
and
Fainshmidt
,
S.
(
2024
), “
Sustainable value creation in multinational enterprises: the role of corporate governance actors
”,
Journal of World Business
, Vol.
59
No.
1
, p.
101503
.
Khan
,
H. U R.
,
Ali
,
M.
,
Olya
,
H.G.T.
,
Zulqarnain
,
M.
and
Khan
,
Z.R.
(
2018
), “
Transformational leadership, corporate social responsibility, organizational innovation, and organizational performance: symmetrical and asymmetrical analytical approaches
”,
Corporate Social Responsibility and Environmental Management
, Vol.
25
No.
6
, pp.
1270
-
1283
, doi: .
Kim
,
M.S.
and
Thapa
,
B.
(
2018
), “
Relationship of ethical leadership, corporate social responsibility and organizational performance
”,
Sustainability
, Vol.
10
No.
2
, p.
447
, doi: .
Kusi
,
M.
,
Zhao
,
F.
and
Sukamani
,
D.
(
2021
), “
Impact of perceived organizational support and green transformational leadership on sustainable organizational performance: a SEM approach
”,
Business Process Management Journal
, Vol.
27
No.
5
, pp.
1373
-
1390
, doi: .
Ledi
,
K.K.
,
Ameza-Xemalordzo
,
E.B.
and
Mensah
,
H.K.
(
2024
), “
Unpacking synergistic dynamics between corporate governance and CSR–the role of stakeholder salience
”,
Business Process Management Journal
.
Lin
,
C.P.
and
Liu
,
M.L.
(
2017
), “
Examining the effects of corporate social responsibility and ethical leadership on turnover intention
”,
Personnel Review
, Vol.
46
No.
3
, pp.
526
-
550
, doi: .
Lis
,
A.
(
2019
), “
Leadership and corporate social responsibility: mapping the conceptual structure of research
”,
Journal of Corporate Responsibility and Leadership
, Vol.
6
No.
1
, p.
7
, doi: .
Luu
,
T.T.
(
2023
), “
Reducing unethical proorganizational behavior in the hospitality sector through socially responsible human resource practices and responsible leadership
”,
Journal of Sustainable Tourism
, Vol.
31
No.
3
, pp.
706
-
734
, doi: .
McLaren
,
C.D.
and
Bruner
,
M.W.
(
2022
), “
Citation network analysis
”,
International Review of Sport and Exercise Psychology
, Vol.
15
No.
1
, pp.
179
-
198
, doi: .
McWilliams
,
A.
and
Siegel
,
D.
(
2001
), “
Corporate social responsibility: a theory of the firm perspective
”,
The Academy of Management Review
, Vol.
26
No.
1
, p.
117
, doi: .
Maak
,
T.
(
2007
), “
Responsible leadership, stakeholder engagement, and the emergence of social capital
”,
Journal of Business Ethics
, Vol.
74
No.
4
, doi: .
Maak
,
T.
and
Pless
,
N.M.
(
2006
), “
Responsible leadership in a stakeholder society – a relational perspective
”,
Journal of Business Ethics
, Vol.
66
No.
1
, pp.
99
-
115
, doi: .
Maak
,
T.
,
Pless
,
N.M.
and
Voegtlin
,
C.
(
2016
), “
Business statesman or shareholder advocate? CEO responsible leadership styles and the microfoundations of political CSR
”,
Journal of Management Studies
, Vol.
53
No.
3
, pp.
463
-
493
, doi: .
Maheshwari
,
G.
and
Kha
,
K.L.
(
2023
), “
A bibliometric analysis of influence of leadership styles on employees and organization in higher education sector from 2007 to 2022
”,
International Journal of Leadership in Education
, pp.
1
-
45
.
Maheshwari
,
G.
and
Maheshwari
,
A.
(
2021
), “
Growing inequalities in the Covid-19 pandemic and their effect on women entrepreneurship: a case of Vietnam
”,
International Entrepreneurship Review
, Vol.
7
No.
4
, pp.
65
-
73
.
Maheshwari
,
G.
,
Ramsawak
,
R.
and
Buertey
,
S.
(
2024
), “
Educational leadership: a fifteen year bibliometric review
”,
Journal of University Teaching and Learning Practice
, Vol.
21
No.
5
, pp.
1
-
31
.
Mallén Broch
,
F.F.
,
Domínguez Escrig
,
E.
,
Chiva Gómez
,
R.
and
Lapiedra Alcamí
,
R.
(
2020
), “
Promoting firm innovativeness through servant leadership and corporate social responsibility to employees
”,
Leadership and Organization Development Journal
, Vol.
41
No.
4
, pp.
615
-
633
, doi: .
Manzoor
,
F.
,
Wei
,
L.
,
Nurunnabi
,
M.
,
Subhan
,
Q.A.
,
Shah
,
S.I.A.
and
Fallatah
,
S.
(
2019
), “
The impact of transformational leadership on job performance and CSR as mediator in SMEs
”,
Sustainability
, Vol.
11
No.
2
, p.
436
, doi: .
Marshall
,
J.
(
2007
), “
The gendering of leadership in corporate social responsibility
”,
Journal of Organizational Change Management
, Vol.
20
No.
2
, pp.
165
-
181
.
Martinez-Perez
,
C.
,
AlvarezPeregrina
,
C.
,
VillaCollar
,
C.
and
SánchezTena
,
M.Á.
(
2020
), “
Current state and future trends: a citation network analysis of the academic performance field
”,
International Journal of Environmental Research and Public Health
, Vol.
17
No.
15
, p.
5352
, doi: .
Maside‐Sanfiz
,
J.M.
,
Iglesias‐Casal
,
A.
,
Mazahreh
,
Q.A.S.
and
López‐Penabad
,
M.C.
(
2024
), “
The impact of competition on environmental and social performance in the MENA banking sector
”,
Corporate Social Responsibility and Environmental Management
, Vol.
31
No.
6
, pp.
6290
-
6317
.
Mazutis
,
D.
and
Zintel
,
C.
(
2015
), “
Leadership and corporate responsibility: a review of the empirical evidence
”,
Annals in Social Responsibility
, Vol.
1
No.
1
, pp.
76
-
107
.
Mihalic
,
T.
,
Mohamadi
,
S.
,
Abbasi
,
A.
and
Dávid
,
L.D.
(
2021
), “
Mapping a sustainable and responsible tourism paradigm: a bibliometric and citation network analysis
”,
Sustainability
, Vol.
13
No.
2
, p.
853
, doi: .
Moin
,
M.F.
,
Ikhide
,
J.E.
and
Li
,
Y.
(
2024
), “
The relationship between green transformational leadership, corporate social responsibility, and task performance
”,
Corporate Social Responsibility and Environmental Management
, Vol.
31
No.
2
, pp.
831
-
837
.
Naseer
,
S.
,
Khalid
,
S.
,
Parveen
,
S.
,
Abbass
,
K.
,
Song
,
H.
and
Achim
,
M.V.
(
2023
), “
COVID-19 outbreak: impact on global economy
”,
Frontiers in Public Health
, Vol.
10
, p.
1009393
.
Nejati
,
M.
,
Salamzadeh
,
Y.
and
Loke
,
C.K.
(
2019
), “
Can ethical leaders drive employees’ CSR engagement?
”,
Social Responsibility Journal
, Vol.
16
No.
5
, pp.
655
-
669
, doi: .
Nejati
,
M.
,
Brown
,
M.E.
,
Shafaei
,
A.
and
Seet
,
P.S.
(
2021
), “
Employees’ perceptions of corporate social responsibility and ethical leadership: are they uniquely related to turnover intention?
”,
Social Responsibility Journal
, Vol.
17
No.
2
, pp.
181
-
197
, doi: .
Nguyen
,
X.H.
,
Doan
,
X.T.
and
Tran
,
H.L.
(
2019
), “
CEO ethical leadership, corporate social responsibility and financial performance in the industrial revolution 4.0: evidence from garment and textile industry
”,
Management Science Letters
, Vol.
9
.
Nguyen
,
N.T.T.
,
Nguyen
,
N.P.
and
Thanh Hoai
,
T.
(
2021
), “
Ethical leadership, corporate social responsibility, firm reputation, and firm performance: a serial mediation model
”,
Heliyon
, Vol.
7
No.
4
, p.
e06809
, doi: .
Niazi
,
U.I.
,
Nisar
,
Q.A.
,
Nasir
,
N.
,
Naz
,
S.
,
Haider
,
S.
and
Khan
,
W.
(
2023
), “
Green HRM, green innovation and environmental performance: the role of green transformational leadership and green corporate social responsibility
”,
Environmental Science and Pollution Research
, Vol.
30
No.
15
, pp.
45353
-
45368
, doi: .
Nicola
,
M.
,
Alsafi
,
Z.
,
Sohrabi
,
C.
,
Kerwan
,
A.
,
Al-Jabir
,
A.
,
Iosifidis
,
C.
and
Agha
,
R.
(
2020
), “
The socio-economic implications of the coronavirus pandemic (COVID-19): A review
”,
International Journal of Surgery
, Vol.
78
, pp.
185
-
193
.
Nugroho
,
D.P.
,
Hsu
,
Y.
,
Hartauer
,
C.
and
Hartauer
,
A.
(
2024
), “
Investigating the interconnection between environmental, social, and governance (ESG), and corporate social responsibility (CSR) strategies: an examination of the influence on consumer behavior
”,
Sustainability
, Vol.
16
No.
2
, p.
614
.
Page
,
M.J.
,
McKenzie
,
J.E.
,
Bossuyt
,
P.M.
,
Boutron
,
I.
,
Hoffmann
,
T.C.
,
Mulrow
,
C.D.
,
Shamseer
,
L.
,
Tetzlaff
,
J.M.
and
Moher
,
D.
(
2021
), “
Updating guidance for reporting systematic reviews: development of the PRISMA 2020 statement
”,
Journal of Clinical Epidemiology
, Vol.
134
, pp.
103
-
112
, doi: .
Pasricha
,
P.
,
Singh
,
B.
and
Verma
,
P.
(
2018
), “
Ethical leadership, organic organizational cultures and corporate social responsibility: an empirical study in social enterprises
”,
Journal of Business Ethics
, Vol.
151
No.
4
, p.
941958
, doi: .
Pham
,
H.Q.
and
Vu
,
P.K.
(
2023
), “
Does public value commitment leadership and corporate social responsibility fuel accountant’s productivity during Covid19 pandemic and new normal: a case study on public sector in vietnam
”,
Public Organization Review
, Vol.
23
No.
2
.
Piñeros Espinosa
,
R.A.
(
2022
), “
Responsible leadership and affective organizational commitment: the mediating effect of corporate social responsibility
”,
Frontiers in Psychology
, Vol.
13
, doi: .
Ramsawak
,
R.
,
Buertey
,
S.
,
Maheshwari
,
G.
,
Dang
,
D.
and
Thanh Phan
,
C.
(
2024
), “
Interlocking boards and firm outcomes: a review
”,
Management Decision
, Vol.
62
No.
4
, pp.
1291
-
1322
.
Rendtorff
,
J.D.
(
2019
),
Philosophy of Management and Sustainability: Rethinking Business Ethics and Social Responsibility in Sustainable Development
,
Emerald Publishing
.
Rendtorff
,
J.D.
(
2020
), “
Handbook of business legitimacy
”,
Responsibility, Ethics and Society
,
Springer International Publishing AG
, p.
1
.
Rendtorff
,
J.D.
(
2023
), “
Future directions of research in ethics and systems
”,
International Journal of Ethics and Systems
, Vol.
39
No.
2
, pp.
181
-
182
.
Rendtorff
,
J.D.
and
Bonnafous-Boucher
,
M.
(
2016
), “
Stakeholder theory: a model for strategic management
”,
Springer International Publishing AG
.
Rendtorff
,
J.D.
and
Bonnafous-Boucher
,
M.
(Eds), (
2023
),
Encyclopedia of Stakeholder Management
,
Edward Elgar Publishing
.
Robbins
,
S.P.
(
1996
), “
Organizational behavior: concepts, controversies and applications, development
”.
Saha
,
R.
,
Cerchione
,
R.
,
Singh
,
R.
and
Dahiya
,
R.
(
2020
), “
Effect of ethical leadership and corporate social responsibility on firm performance: a systematic review
”,
Corporate Social Responsibility and Environmental Management
, Vol.
27
No.
2
, pp.
409
-
429
, doi: .
Sayed
,
S.
and
Ansari
,
A.H.
(
2020
), “
Mediation of corporate social responsibility on transformational leadership and organisational commitment: an empirical evidence
”,
International Journal of Technology and Globalisation
, Vol.
8
Nos
3/4
, p.
280
, doi: .
Schinzel
,
U.
(
2018
), “
Responsible leadership and corporate social responsibility (CSR) in Luxembourg
”,
International Journal of Organizational Analysis
, Vol.
26
No.
3
, pp.
415
-
431
, doi: .
Sedighi
,
M.
(
2016
), “
Application of word cooccurrence analysis method in mapping of the scientific fields (case study: the field of informetrics
”,
Library Review
, Vol.
65
Nos
1/2
, pp.
52
-
64
, doi: .
Simunaniemi
,
A.M.
,
Valkjärvi
,
M.
,
Franzén
,
R.
,
Liikala
,
S.
,
Tähtinen
,
J.
,
Suomi
,
K.
and
Jeminen
,
J.
(
2023
), “
Microentrepreneurs as socially responsible leaders
”,
South Asian Journal of Business and Management Cases
, Vol.
12
No.
1
, pp.
14
-
30
.
Small
,
H.
(
1973
), “
Cocitation in the scientific literature: a new measure of the relationship between two documents
”,
Journal of the American Society for Information Science
, Vol.
24
No.
4
, pp.
265
-
269
.
Sobaih
,
A.E.E.
,
Gharbi
,
H.
,
Hasanein
,
A.M.
and
Elnasr
,
A.E.A.
(
2022
), “
The mediating effects of green innovation and corporate social responsibility on the link between transformational leadership and performance: an examination using SEM analysis
”,
Mathematics
, Vol.
10
No.
15
, p.
2685
, doi: .
Soni
,
M.
(
2022
), “
Environmentally specific transformational leadership and proenvironmental behavior: an empirical analysis of energy sector
”,
International Journal of Organizational Analysis
, doi: .
Srour
,
C.K.G.E.K.
,
KheirElDin
,
A.
and
Samir
,
Y.M.
(
2020
), “
The effect of green transformational leadership on organizational citizenship behavior in Egypt
”,
Academic Journal of Interdisciplinary Studies
, Vol.
9
No.
5
, p.
1
, doi: .
Strand
,
R.
(
2011
), “
Exploring the role of leadership in corporate social responsibility: a review
”,
Journal of Leadership, Accountability, and Ethics
, Vol.
8
No.
4
, pp.
84
-
96
.
Stogdill
,
R.M.
(
1950
), “
Leadership, membership and organization
”,
Psychological Bulletin
, Vol.
47
No.
1
, p.
114
, doi: .
Tian
,
Q.
,
Liu
,
Y.
and
Fan
,
J.
(
2015
), “
The effects of external stakeholder pressure and ethical leadership on corporate social responsibility in China
”,
Journal of Management and Organization
, Vol.
21
No.
4
, pp.
388
-
410
, doi: .
Tichenor
,
J.
,
Green
,
A.
,
West
,
J.
and
Croom
,
R.
(
2022
), “
Moving beyond the business case for female leaders: a longitudinal panel study of the impact of female leadership on corporate social responsibility
”,
Business and Society Review
, Vol.
127
No.
3
, pp.
639
-
661
, doi: .
Tosun
,
C.
,
Parvez
,
M.O.
,
Bilim
,
Y.
and
Yu
,
L.
(
2022
), “
Effects of green transformational leadership on green performance of employees via the mediating role of corporate social responsibility: reflection from North Cyprus
”,
International Journal of Hospitality Management
, Vol.
103
, p.
103218
, doi: .
Tourigny
,
L.
,
Han
,
J.
,
Baba
,
V.V.
and
Pan
,
P.
(
2019
), “
Ethical leadership and corporate social responsibility in China: a multilevel study of their effects on trust and organizational citizenship behavior
”,
Journal of Business Ethics
, Vol.
158
No.
2
, pp.
427
-
440
, doi: .
Tran
,
H.T.
,
Jeon
,
M.M.
and
Pham
,
V.T.H.
(
2023
), “
CSR and employee attachment in tourism firms: perceived ethical leadership, responsible management, and the mediating role of community engagement
”,
Journal of Human Resources in Hospitality and Tourism
, Vol.
22
No.
1
, pp.
97
-
119
, doi: .
Ullah
,
I.
,
Hameed
,
R.M.
,
Kayani
,
N.Z.
and
Fazal
,
Y.
(
2022
), “
CEO ethical leadership and corporate social responsibility: examining the mediating role of organizational ethical culture and intellectual capital
”,
Journal of Management and Organization
, Vol.
28
No.
1
, pp.
99
-
119
, doi: .
van de Bunt
,
S.
and
Salomons
,
L.
(
2018
), “
Servant leadership as a key for the successful implementation of corporate social responsibility in the pharmaceutical industry
”, in
The Palgrave Handbook of Workplace Spirituality and Fulfillment
,
Springer International Publishing
, pp.
397
-
422
, doi: .
Waldman
,
D.A.
,
Siegel
,
D.S.
and
Javidan
,
M.
(
2006a
), “
Components of CEO transformational leadership and corporate social responsibility
”,
Journal of Management Studies
, Vol.
43
No.
8
, pp.
1703
-
1725
, doi: .
Waldman
,
D.A.
,
De Luque
,
M.S.
,
Washburn
,
N.
,
House
,
R.J.
,
Adetoun
,
B.
,
Barrasa
,
A.
,
Bobina
,
M.
,
Bodur
,
M.
,
Chen
,
Y.J.
,
Debbarma
,
S.
,
Dorfman
,
P.
,
Dzuvichu
,
R.R.
,
Evcimen
,
I.
,
Fu
,
P.
,
Grachev
,
M.
,
Duarte
,
R.G.
,
Gupta
,
V.
,
Den Hartog
,
D.N.
,
De Hoogh
,
A.H.B.
and
Wilderom
,
C.P.M.
(
2006b
), “
Cultural and leadership predictors of corporate social responsibility values of top management: a GLOBE study of 15 countries
”,
Journal of International Business Studies
, Vol.
37
No.
6
, doi: .
Wang
,
G.
,
Devine
,
R.A.
,
Molina-Sieiro
,
G.
and
Holmes
,
R.M.
 Jr
, (
2024
), “
Strategic leaders and corporate social responsibility: a meta-analytic review
”,
Journal of Management
, Vol.
50
No.
7
, pp.
2675
-
2714
.
Williams
,
J.J.
and
Seaman
,
A.E.
(
2016
), “
The influence of ethical leadership on managerial performance: mediating effects of mindfulness and corporate social responsibility
”,
Journal of Applied Business Research (JABR)
, Vol.
32
No.
3
, pp.
815
-
828
, doi: .
Wu
,
L.Z.
,
Kwan
,
H.K.
,
Yim
,
F.H.
,
Chiu
,
R.K.
and
He
,
X.
(
2015
), “
CEO ethical leadership and corporate social responsibility: a moderated mediation model
”,
Journal of Business Ethics
, Vol.
130
No.
4
, pp.
819
-
831
, doi: .
Wu
,
Q.
,
Cherian
,
J.
,
Samad
,
S.
,
Comite
,
U.
,
Hu
,
H.
,
Gunnlaugsson
,
S.B.
and
Sial
,
M.S.
(
2021
), “
The role of CSR and ethical leadership to shape employees’ pro-environmental behavior in the era of industry 4.0. A case of the banking sector
”,
Sustainability
, Vol.
13
No.
17
, p.
9773
.
Yang
,
H.C.
and
Kim
,
Y.E.
(
2018
), “
The effects of corporate social responsibility on job performance: moderating effects of authentic leadership and meaningfulness of work
”,
The Journal of Asian Finance, Economics and Business
, Vol.
5
No.
3
, pp.
121
-
132
, doi: .
Yasin
,
R.
(
2021
), “
Responsible leadership and employees’ turnover intention. Explore the mediating roles of ethical climate and corporate image
”,
Journal of Knowledge Management
, Vol.
25
No.
7
, pp.
1760
-
1781
, doi: .
Yin
,
J.
and
Zhang
,
Y.
(
2012
), “
Institutional dynamics and corporate social responsibility (CSR) in an emerging country context: evidence from China
”,
Journal of Business Ethics
, Vol.
111
No.
2
, pp.
301
-
316
, doi: .
Yoopetch
,
C.
,
Nimsai
,
S.
and
Kongarchapatara
,
B.
(
2022
), “
Bibliometric analysis of corporate social responsibility in tourism
”,
Sustainability
, Vol.
15
No.
1
, p.
668
, doi: .
Zhang
,
X.
,
Li
,
D.
and
Guo
,
X.
(
2022
), “
Antecedents of responsible leadership: proactive and passive responsible leadership behavior
”,
Sustainability
, Vol.
14
No.
14
, p.
8694
.
Zhao
,
L.
,
Yang
,
M.M.
,
Wang
,
Z.
and
Michelson
,
G.
(
2023
), “
Trends in the dynamic evolution of corporate social responsibility and leadership: a literature review and bibliometric analysis
”,
Journal of Business Ethics
, Vol.
182
No.
1
, pp.
135
-
157
, doi: .
Zhu
,
Y.
,
Sun
,
L.Y.
and
Leung
,
A.S.M.
(
2014
), “
Corporate social responsibility, firm reputation, and firm performance: the role of ethical leadership
”,
Asia Pacific Journal of Management
, Vol.
31
No.
4
, pp.
925
-
947
, doi: .
Bass
,
B.M.
and
Avolio
,
B.J.
(
1994
),
Improving Organizational Effectiveness through Transformational Leadership
,
Sage Publications
,
London
.
Brown
,
M.E.
and
Treviño
,
L.K.
(
2006
), “
Ethical leadership: a review and future directions
”,
The Leadership Quarterly
, Vol.
17
No.
6
, doi: .
Carroll
,
A.B.
(
1977
),
Managing Corporate Social Responsibility
,
Scott Foresman and Co
.
Carroll
,
A.B.
(
1979
), “
A ThreeDimensional conceptual model of corporate performance
”,
The Academy of Management Review
, Vol.
4
No.
4
, p.
497
, doi: .
Carroll
,
A.B.
(
1999
), “
Corporate social responsibility
”,
Business and Society
, Vol.
38
No.
3
, pp.
268
-
295
, doi: .
Cropanzano
,
R.
,
Byrne
,
Z.S.
,
Bobocel
,
D.R.
and
Rupp
,
D.E.
(
2001
), “
Moral virtues, fairness heuristics, social entities, and other denizens of organizational justice
”,
Journal of Vocational Behavior
, Vol.
58
No.
2
, pp.
164
-
209
, doi: .
Dutton
,
J.E.
and
Dukerich
,
J.M.
(
1991
), “
Keeping an eye on the mirror: image and identity in organizational adaptation
”,
Academy of Management Journal
, Vol.
34
No.
3
, pp.
517
-
554
, doi: .
Dutton
,
J.E.
,
Dukerich
,
J.M.
and
Harquail
,
C.V.
(
1994
), “
Organizational images and member identification
”,
Administrative Science Quarterly
, Vol.
39
No.
2
, p.
239263
, doi: .
Egghe
,
L.
(
2006
), “
Theory and practise of the gindex
”,
Scientometrics
, Vol.
69
No.
1
, pp.
131
-
152
, doi: .
Hirsch
,
J.E.
(
2005
), “
An index to quantify an individual’s scientific research output
”,
Proceedings of the National Academy of Sciences
, Vol.
102
No.
46
, pp.
16569
-
16572
, doi: .
McWilliams
,
A.
,
Siegel
,
D.S.
and
Wright
,
P.M.
(
2006
), “
Corporate social responsibility: strategic implications
”,
Journal of Management Studies
, Vol.
43
No.
1
, p.
118
, doi: .
Pinski
,
G.
and
Narin
,
F.
(
1976
), “
Citation influence for journal aggregates of scientific publications: theory, with application to the literature of physics
”,
Information Processing and Management
, Vol.
12
No.
5
, pp.
297
-
312
, doi: .
Podsakoff
,
P.M.
,
MacKenzie
,
S.B.
,
Lee
,
J.Y.
and
Podsakoff
,
N.P.
(
2003
), “
Common method biases in behavioral research: a critical review of the literature and recommended remedies
”,
Journal of Applied Psychology
, Vol.
88
No.
5
, p.
879903
, doi: .
Podsakoff
,
P.M.
,
MacKenzie
,
S.B.
and
Podsakoff
,
N.P.
(
2012
), “
Sources of method bias in social science research and recommendations on how to control it
”,
Annual Review of Psychology
, Vol.
63
No.
1
, pp.
539
-
569
, doi: .
Podsakoff
,
P.M.
and
Organ
,
D.W.
(
1986
), “
Selfreports in organizational research: problems and prospects
”,
Journal of Management
, Vol.
12
No.
4
, pp.
531
-
544
, doi: .
Rupp
,
D.E.
,
Ganapathi
,
J.
,
Aguilera
,
R.V.
and
Williams
,
C.A.
(
2006
), “
Employee reactions to corporate social responsibility: an organizational justice framework
”,
Journal of Organizational Behavior
, Vol.
27
No.
4
, pp.
537
-
543
, doi: .
Sen
,
S.
(
2006
), “
The role of corporate social responsibility in strengthening multiple stakeholder relationships: a field experiment
”,
Journal of the Academy of Marketing Science
, Vol.
34
No.
2
, pp.
158
-
166
, doi: .
Siegel
,
D.S.
and
Vitaliano
,
D.F.
(
2007
), “
An empirical analysis of the strategic use of corporate social responsibility
”,
Journal of Economics and Management Strategy
, Vol.
16
No.
3
, p.
773792
, doi: .
Wang
,
C.
,
Tee
,
M.
,
Roy
,
A.E.
,
Fardin
,
M.A.
,
Srichokchatchawan
,
W.
,
Habib
,
H.A.
,
Tran
,
B.X.
,
Hussain
,
S.
,
Hoang
,
M.T.
,
Le
,
X.T.
,
Ma
,
W.
,
Pham
,
H.Q.
,
Shirazi
,
M.
,
Taneepanichskul
,
N.
,
Tan
,
Y.
,
Tee
,
C.
,
Xu
,
L.
,
Xu
,
Z.
,
Vu
,
G.T.
and
Kuruchittham
,
V.
(
2021
), “
The impact of COVID19 pandemic on physical and mental health of asians: a study of seven Middle income countries in asia
”,
Plos One
, Vol.
16
No.
2
, p.
e0246824
, doi: .
Yates
,
E.J.
and
Dixon
,
L.C.
(
2015
), “
PageRank as a method to rank biomedical literature by importance
”,
Source Code for Biology and Medicine
, Vol.
10
No.
1
, p.
16
, doi: .
Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode

or Create an Account

Close Modal
Close Modal