Scheduling of production in a wire rope factory is complicated by several features: (a) the simultaneous requirement for two types of limited resource, machines and bobbins; (b) multi‐stage production with normally two or three stranding and one or two closing operations; (c)queuing at the closing machines; the typical job splits into sub‐batches when passing from the stranding to the closing operation; these sub‐batches usually queue at the closing operations which, being faster than stranding operations, generally receive work from several queues;(d) alternative choices in the selection of machines and bobbin sizes for any given stranding or closing operation; (e) the presence of random elements in the timing of machine breakdowns and repairs. In this case study factory in a developing country, the existing control of production flows was ad hoc rather than according to a specified method. The management needed to know whether a scientific scheduling approach could significantly improve the low utilisation of machines. As a first attempt a strategy was synthesised based on well‐known concepts from the theory of scheduling in static and dynamic environments, taking into consideration certain effects of the complicating factors mentioned above. Simulation revealed that a significant improvement was possible.
Article navigation
1 March 1990
Research Article|
March 01 1990
Despatching and Dynamic Machine Loading in a Wire Rope Factory: A Case Study
Prakash G. Awate;
Prakash G. Awate
Asian Institute of Technology, Bangkok, Thailand
Search for other works by this author on:
Dirk L. van Oudheusden;
Dirk L. van Oudheusden
Asian Institute of Technology, Bangkok, Thailand
Search for other works by this author on:
Sukhum Dechawongsuwan;
Sukhum Dechawongsuwan
Asian Institute of Technology, Bangkok, Thailand
Search for other works by this author on:
Paisal Yenradee
Paisal Yenradee
Asian Institute of Technology, Bangkok, Thailand
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1990
International Journal of Operations & Production Management (1990) 10 (3): 61–70.
Citation
Awate PG, van Oudheusden DL, Dechawongsuwan S, Yenradee P (1990), "Despatching and Dynamic Machine Loading in a Wire Rope Factory: A Case Study". International Journal of Operations & Production Management, Vol. 10 No. 3 pp. 61–70, doi: https://doi.org/10.1108/01443579010137762
Download citation file:
151
Views
New and popular articles
Suggested Reading
Balancing Method for a Semiautomatic Production Line
Integrated Manufacturing Systems (January,1993)
Minimising Moulding Production and Material Storage Costs
International Journal of Physical Distribution & Materials Management (September,1989)
On Using Buffer Stock to Combat Schedule Instability
International Journal of Operations & Production Management (July,1990)
Multi‐objective flow shop scheduling using hybrid simulated annealing
Measuring Business Excellence (August,2010)
FMS Management — The Scope for Further Research
International Journal of Operations & Production Management (March,1985)
Related Chapters
Predicting the Performance of a Two-Stage Flowshop: Lower Bounds and Heuristics for Single and Bicriteria Measures
Advances in Business and Management Forecasting
Easing Up Transition: A Strategic Roadmap Toward Industry 4.0
Modeling Economic Growth in Contemporary Malaysia
Safety Management in the Era of Emerging Industrial Revolution: The Conceptualisation of Safety 4.0
Fostering Sustainable Development in the Age of Technologies
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.