A survey of project scheduling problems since 1973 limited to work done specifically in the project scheduling area (although several techniques developed for assembly line balancing and job‐shop scheduling can be applicable to project scheduling): the survey includes the work done on fundamental problems such as the resource‐constrained project scheduling problem (RCPSP); time/cost trade‐off problem (TCTP); and payment scheduling problem (PSP). Also discusses some recent research that integrates RCPSP with either TCTP or PSP, and PSP with TCTP. In spite of their practical relevance, very little work has been done on these combined problems to date. The future of the project scheduling literature appears to be developing in the direction of combining the fundamental problems and developing efficient exact and heuristic methods for the resulting problems.
Article navigation
1 November 1993
Research Article|
November 01 1993
Project Scheduling Problems: A Survey Available to Purchase
Oya Icmeli;
Oya Icmeli
Cleveland State University, Ohio, USA
Search for other works by this author on:
S. Selcuk Erenguc;
S. Selcuk Erenguc
University of Florida, Gainesville, USA
Search for other works by this author on:
Christopher J. Zappe
Christopher J. Zappe
University of Florida, Gainesville, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1993
International Journal of Operations & Production Management (1993) 13 (11): 80–91.
Citation
Icmeli O, Selcuk Erenguc S, Zappe CJ (1993), "Project Scheduling Problems: A Survey". International Journal of Operations & Production Management, Vol. 13 No. 11 pp. 80–91, doi: https://doi.org/10.1108/01443579310046454
Download citation file:
Suggested Reading
A heuristic scheduling algorithm for improving the duration and net present value of a project
International Journal of Operations & Production Management (January,1995)
JOB: An Instructive Job Shop Scheduling Environment
International Journal of Operations & Production Management (November,1993)
An effective teaching-learning-based optimization algorithm for the multi-skill resource-constrained project scheduling problem
Journal of Modelling in Management (September,2019)
A genetic algorithm with neighborhood search procedures for unrelated parallel machine scheduling problem with sequence-dependent setup times
Journal of Modelling in Management (January,2020)
Representation for Genetic and Evolutionary Algorithms: Studies in Fuzziness and Soft Computing
Industrial Robot (April,2003)
Related Chapters
A multiple objective approach to assigning classes for an executive MBA program
Applications of Management Science
Enacting the Everyday: The Dialectic of Algorithms, Data Activism, and Platform Power
Contesting Platform Power: The Oppositional Affordances of Data Activism
Conclusion: The Future of Platform Power and Data Activism
Contesting Platform Power: The Oppositional Affordances of Data Activism
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
