Article navigation

In this paper, the authors investigate the effects bottleneck machines have on the performance of a multi‐stage job shop. The operation performed by the bottleneck and its position in the product Bill of Materials is varied to determine the effects on system performance. It was found that the best place for the bottleneck machine to be located was at gateway operations located low in the Bill of Materials.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal