Two distinct models of delivery reliability versus delivery speed are tested. On the basis of data from a survey of 193 manufacturing firms, factors associated with the “planning” systems of firms, such as production‐plan goals achieved, inventory goals achieved,and master schedule performance, were found to have a significant effect on delivery reliability. In follow‐up interviews with 13 plant managers;it was found that “process”‐related factors were associated with delivery speed capabilities. Specifically, the biggest inroads to be made into delivery speed are first on the design/manufacturing interface, secondly on the subsequent “translation” of these designs to supplier requirements, and lastly on the production floor in terms of process layout.
Article navigation
1 February 1992
Research Article|
February 01 1992
An Empirical Study of Delivery Speed and Reliability
Robert B. Handfield;
Robert B. Handfield
Michigan State University, East Lansing, Michigan
Search for other works by this author on:
Ronald T. Pannesi
Ronald T. Pannesi
University of North Carolina at Chapel Hill, North Carolina, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1992
International Journal of Operations & Production Management (1992) 12 (2): 58–72.
Citation
Handfield RB, Pannesi RT (1992), "An Empirical Study of Delivery Speed and Reliability". International Journal of Operations & Production Management, Vol. 12 No. 2 pp. 58–72, doi: https://doi.org/10.1108/01443579210009069
Download citation file:
New and popular articles
Suggested Reading
Tyre Manufacturing: Simplifying a Complex Production Planning and Scheduling Problem
Logistics Information Management (March,1991)
Impact of product structure on order review/evaluation procedures
Industrial Management & Data Systems (April,2005)
Technical Paper Response: Determination of Manufacturing Cycle Time in Multi‐stage Production Systems
International Journal of Operations & Production Management (March,1989)
The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production Systems
International Journal of Operations & Production Management (January,1988)
Production Management Techniques: Push‐Pull Classification and Application Conditions
International Journal of Operations & Production Management (February,1988)
Related Chapters
Predicting the Performance of a Two-Stage Flowshop: Lower Bounds and Heuristics for Single and Bicriteria Measures
Advances in Business and Management Forecasting
Bridging the Gap: A Literature Survey on Gender Mainstreaming in Ride-Sharing and Delivery Platforms
Gender Mainstreaming and Development
Industrial District Firms Do Not Smile: Structuring the Value Chain between Local and Global
Breaking up the Global Value Chain: Opportunities and Consequences
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
