Two distinct models of delivery reliability versus delivery speed are tested. On the basis of data from a survey of 193 manufacturing firms, factors associated with the “planning” systems of firms, such as production‐plan goals achieved, inventory goals achieved,and master schedule performance, were found to have a significant effect on delivery reliability. In follow‐up interviews with 13 plant managers;it was found that “process”‐related factors were associated with delivery speed capabilities. Specifically, the biggest inroads to be made into delivery speed are first on the design/manufacturing interface, secondly on the subsequent “translation” of these designs to supplier requirements, and lastly on the production floor in terms of process layout.
Article navigation
1 February 1992
Research Article|
February 01 1992
An Empirical Study of Delivery Speed and Reliability
Robert B. Handfield;
Robert B. Handfield
Michigan State University, East Lansing, Michigan
Search for other works by this author on:
Ronald T. Pannesi
Ronald T. Pannesi
University of North Carolina at Chapel Hill, North Carolina, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1992
International Journal of Operations & Production Management (1992) 12 (2): 58–72.
Citation
Handfield RB, Pannesi RT (1992), "An Empirical Study of Delivery Speed and Reliability". International Journal of Operations & Production Management, Vol. 12 No. 2 pp. 58–72, doi: https://doi.org/10.1108/01443579210009069
Download citation file:
New and popular articles
Suggested Reading
Tyre Manufacturing: Simplifying a Complex Production Planning and Scheduling Problem
Logistics Information Management (March,1991)
Impact of product structure on order review/evaluation procedures
Industrial Management & Data Systems (April,2005)
Technical Paper Response: Determination of Manufacturing Cycle Time in Multi‐stage Production Systems
International Journal of Operations & Production Management (March,1989)
The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production Systems
International Journal of Operations & Production Management (January,1988)
Production Management Techniques: Push‐Pull Classification and Application Conditions
International Journal of Operations & Production Management (February,1988)
Related Chapters
Predicting the Performance of a Two-Stage Flowshop: Lower Bounds and Heuristics for Single and Bicriteria Measures
Advances in Business and Management Forecasting
Bridging the Gap: A Literature Survey on Gender Mainstreaming in Ride-Sharing and Delivery Platforms
Gender Mainstreaming and Development
Application of risk and reliability to the management of bridges
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.