Companies using production of small batches, with a large number of products made in a number of variants, often have a high level of work in progress. Much has been published recently about production flow groups and balancing of flow to solve the problems experienced in these companies and production flow groups seem to be regarded as a panacea. This means that the cost of fixed assets for this type of industry will increase, but less capital will be tied up in products and work in progress. Assesses whether production flow groups are in reality the optimal way of organizing batch production and gives some assistance in the design of systems for batch production in order to achieve shorter lead times and decreased costs. The results of case studies show that there is not a single solution to the problems, although a large number of advantages are realized. Compared to the traditional way of organizing production this way of operating breaks down the organization into small units, adapts the production organization to prevailing conditions and unites the different parts into a functioning whole,together with the planning function.
Article navigation
1 April 1992
Research Article|
April 01 1992
Design of Production Systems for Batch Production in Short Series to Reduce Lead Time
Kurt Rosander
Kurt Rosander
Chalmers University of Technology, Göteborg, Sweden
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1992
International Journal of Operations & Production Management (1992) 12 (4): 53–60.
Citation
Rosander K (1992), "Design of Production Systems for Batch Production in Short Series to Reduce Lead Time". International Journal of Operations & Production Management, Vol. 12 No. 4 pp. 53–60, doi: https://doi.org/10.1108/01443579210011606
Download citation file:
New and popular articles
Suggested Reading
Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm
Measuring Business Excellence (August,2009)
Controlling Input: The Real Key to Shorter Lead Times
The International Journal of Logistics Management (January,1990)
Achieving Competitiveness Through Logistics
The International Journal of Logistics Management (January,1991)
An Evaluation of the State of Research in the Economic Lot Sizing Problem
Management Research News (January,1987)
Service postponement: Translating manufacturing postponement to service operations
Journal of Manufacturing Technology Management (May,2010)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.