Open figure viewer
Presents a mathematical model for determining Economic Production Quantity (EPQ) in a multistage flow‐shop production system for the case where the demand for items per unit time is deterministic and the planning horizon is finite. Solves an example problem to illustrate the model.
This content is only available via PDF.
© MCB UP Limited
1993
You do not currently have access to this content.
