Effective management of resources in a dynamic, multiproject environment requires consideration of two key issues: the availability of each of the multiple resources and the method of scheduling these resources to complete activities and, subsequently, projects. Identifies the trade‐offs between performance and the availability of multiple resources, when some resources are more costly than others. Finds that there are significant effects when the level of either the costly resources or the cheaper resources are varied, that trade‐offs can be made by reducing the availability of the costly resources and increasing the availability of the cheaper resources and that the improvement in completion time performance is reasonably linear over the tested ranges and the rates of improvement differ over the ranges. Describes the resource allocation factors and treatments as well as the scheduling heuristics. Uses a finite scheduling algorithm along with the prioritization heuristics to schedule the constrained multiple resources simultaneously and a simulation to replicate the environment. Develops linear regressions to provide further insight.
Article navigation
1 May 1993
Research Article|
May 01 1993
An Examination of Resourcing Policies for the Multi‐resource Problem
Ellen J. Dumond;
Ellen J. Dumond
California State University, Fullerton, California, USA
Search for other works by this author on:
John Dumond
John Dumond
RAND, Santa Monica, California, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1993
International Journal of Operations & Production Management (1993) 13 (5): 54–75.
Citation
Dumond EJ, Dumond J (1993), "An Examination of Resourcing Policies for the Multi‐resource Problem". International Journal of Operations & Production Management, Vol. 13 No. 5 pp. 54–75, doi: https://doi.org/10.1108/01443579310028175
Download citation file:
New and popular articles
Suggested Reading
Production scheduling in ERP systems: An AI‐based approach to face the gap
Business Process Management Journal (April,2003)
Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty
Engineering, Construction and Architectural Management (May,2020)
Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol
Engineering, Construction and Architectural Management (May,2018)
Understanding and visualizing schedule deviations in construction projects using fault tree analysis
Engineering, Construction and Architectural Management (May,2020)
Resource levelling optimization model considering float loss impact
Engineering, Construction and Architectural Management (July,2018)
Related Chapters
A multiple objective approach to assigning classes for an executive MBA program
Applications of Management Science
A Machine Learning–Based Buffer Estimation for Construction Schedules Under Uncertainty
The Role of Artificial Intelligence Applications in Business
Chinese Tourists and the Sun: Implications for Designing Experiences
Delivering Tourism Intelligence: From Analysis to Action
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
