Article navigation

Studies the feasibility of using the metamodelling technique for the performance analysis of a just‐in‐time manufacturing system. The data for the analysis are generated by a Siman simulation model. Develops a regression metamodel following an R‐IV fractional factorial design. Results show that, of the 15 variables considered, only assembly time, kanban capacity, and the interaction effect between demand and kanban capacity are statistically significant. Performs cross‐validation. Finds the results of the metamodel developed to supplement the simulation model to be accurate.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options