Article navigation

Presents a hierarchical production planning (HPP) model that integrates aggregate‐type planning, family disaggregate planning,lot‐sizing, job scheduling and evaluation of the final production plans into a complete planning and scheduling system. In‐corporation of a simple heuristic scheduling algorithm into the HPP model is the primary contribution. The scheduling routine schedules the jobs based on just‐in‐time (JIT) concept and provides detailed shopfloor information such as job tardiness, bottleneck work centres, capacity level,inventory or shortage level and number of set‐ups. This information is critical for effective shopfloor management. Experimental results indicate that the performance of the present model is better than the existing models in general. However, the model is truly superior under tight capacity conditions.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options