Small manufacturing companies make up the base industrial backbone of many countries including the USA. Even though CIM is generally believed to help manufacturers to compete globally, small companies are not able to adopt the technology owing to CIM′s substantial investments and its associated high risk. An alternative CIM approach is urgently needed. Proposes a shared CIM system for various types of production environments including make‐to‐stock (MTS), assembled‐to‐order (ATO),make‐to‐order (MTO), and engineered‐to‐order (ETO). Analysis based on production logic was performed in order to develop a series of guidelines for the successful application of shared CIM systems in the above production companies. It was found that the shared facility capacity allocation was the most important activity in the production‐planning process, the degree of co‐operation being highest in an ETO environment. The key success in the operation of the system will depend on the co‐operation of production planning in MTS and ATO environments, co‐operation of production control in an MTO environment,and co‐operation in engineering‐design and production control in an ETO environment.
Article navigation
1 May 1995
Research Article|
May 01 1995
Shared computer‐integrated manufacturing for various types of production environment
T.M.A. Ari Samadhi;
T.M.A. Ari Samadhi
University of New South Wales, Sydney, Australia
Search for other works by this author on:
K. Hoang
K. Hoang
University of New South Wales, Sydney, Australia
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1995
International Journal of Operations & Production Management (1995) 15 (5): 95–108.
Citation
Ari Samadhi T, Hoang K (1995), "Shared computer‐integrated manufacturing for various types of production environment". International Journal of Operations & Production Management, Vol. 15 No. 5 pp. 95–108, doi: https://doi.org/10.1108/01443579510083695
Download citation file:
New and popular articles
Suggested Reading
Computer Integrated Flexible Manufacturing: An Implementation Framework
International Journal of Operations & Production Management (January,1990)
The Toyota Production System — Lessons for American Management
International Journal of Operations & Production Management (January,1984)
Product Structure Analysis for the Master Scheduling of Assemble‐to‐order Products
International Journal of Operations & Production Management (November,1992)
The complexity of scheduling in practice
International Journal of Operations & Production Management (October,1996)
Configurator goes live for Wynn Marine
Assembly Automation (June,1996)
Related Chapters
Predicting the Performance of a Two-Stage Flowshop: Lower Bounds and Heuristics for Single and Bicriteria Measures
Advances in Business and Management Forecasting
Leveraging Organizational Learning and Alliances in Complex and Changing Business Environments
Global Entrepreneurship: Past, Present & Future
An Examination of Alliances and Corporate Social Responsibility
Research on Professional Responsibility and Ethics in Accounting
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
