In this paper, a preliminary framework for the assessment of change management is developed, based on recent research and case interviews at three consulting companies. The framework distinguishes between efficiency and effectiveness measurements on change management, and evaluates the management methods and outcomes of the change projects separately. The framework is applied to analyze and compare the change projects in three Finnish manufacturing companies. The results indicate that the preliminary framework can explain the difference between successful and less successful change management in manufacturing processes. By applying the measurement framework in practice, organizations can continuously improve their change management capabilities. More empirical research is needed to test the framework further.
Article navigation
1 November 1999
Research Article|
November 01 1999
Measuring change project management in manufacturing
Tapani Taskinen;
Tapani Taskinen
VTT Manufacturing Technology, Finland
Search for other works by this author on:
Riitta Smeds
Riitta Smeds
Helsinki University of Technology, Finland
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1999
International Journal of Operations & Production Management (1999) 19 (11): 1168–1187.
Citation
Taskinen T, Smeds R (1999), "Measuring change project management in manufacturing". International Journal of Operations & Production Management, Vol. 19 No. 11 pp. 1168–1187, doi: https://doi.org/10.1108/01443579910291078
Download citation file:
New and popular articles
Suggested Reading
Bootstrap lower confidence limits for the process capability indices Cp, Cpk and Cpm
International Journal of Quality & Reliability Management (December,2002)
Corporate communications within a BPR context
Business Process Management Journal (October,2000)
A state‐time model to measure the reconfigurability of manufacturing areas – key to performance
Integrated Manufacturing Systems (December,2001)
Determining the optimum level of work in progress using constraint analysis and computer simulation
Assembly Automation (December,2000)
Using simulation to predict system performance: a case study of an electro‐phoretic deposition plant
Integrated Manufacturing Systems (October,1995)
Related Chapters
Modeling Affect and Cognition: Opportunities and Challenges for Managerial and Organizational Cognition
Methodological Challenges and Advances in Managerial and Organizational Cognition
How Do We Measure Public Value? From Theory to Practice
Public Value Management, Measurement and Reporting
The UNESCO Institute for Statistics (UIS) Strategy on Teacher Statistics: Developing Effective Measures of Quantity and Quality in Education
Promoting and Sustaining a Quality Teacher Workforce
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
