Open figure viewer
This article presents the results of a simulation study of implementation practices for material requirements planning systems. In particular, the role of safety lead times in ensuring effective delivery performance is analysed and some general guidelines are suggested.
This content is only available via PDF.
© MCB UP Limited
1981
You do not currently have access to this content.
