Purpose

The purpose of this paper is to explore the relationship between product modularity (PM) and supply chain integration (SCI), and to identify factors influencing this relationship.

Design/methodology/approach

A case study approach involving in‐depth interviews on three modular and two non‐modular design projects in the Hong Kong and Pearl River Delta region was conducted. Within and cross‐case analyses were adopted.

Findings

Results support the current view that modular design is related to a loosely coordinated supply chain, whereas integrated design is associated with a tightly coordinated supply chain. However, this relationship is affected and explained by four contingency factors: new module/component development, technological knowledge leakage and creation, project team size and supply chain efficiency.

Research limitations/implications

The paper used a case study approach so the generalizability of the study is limited. This approach, however, enabled us to examine explicitly the relationship between PM and SCI, where empirical research was lacking. The rich content of each case suggested how and why modular design affects supply chain management.

Originality/value

The findings of this paper increase the understanding of the dynamics of modular product design and supply chain management. The paper also explores four contingency factors affecting the relationship.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal