The successful development of innovative new CAD/CAM systems is critical to the future viability of many companies. CAD/CAM systems represent one of the fastest growing, highest potential, and riskiest new manufacturing technologies. Successful development and adoption requires much richer and more complex relationships between developing and adopting organisations and between managers in different functional areas and operations management. A framework is developed to identify and outline the implications of changing developer/adopter relationships for operations management, based on three interactive sub‐processes — the development, adoption and interfacing sub‐processes. Eight recommendations are made for operations managers to improve their involvement in developer/adopter relationships and so improve the success of CAD/CAM systems adoption.
Article navigation
1 April 1986
Review Article|
April 01 1986
Developer/Adopter Relationships in the Adoption of CAD/CAM Systems: Implications for Operations Management
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1986
International Journal of Operations & Production Management (1986) 6 (4): 87–100.
Citation
More RA (1986), "Developer/Adopter Relationships in the Adoption of CAD/CAM Systems: Implications for Operations Management". International Journal of Operations & Production Management, Vol. 6 No. 4 pp. 87–100, doi: https://doi.org/10.1108/eb054774
Download citation file:
New and popular articles
Suggested Reading
Adept Technology's SILMA division to preview assembly process planning and design software
Assembly Automation (September,1999)
Toshiba selects Technomatix VALISYS for quality drive
Assembly Automation (September,1999)
The Management of Microprocessor Technology in the Engineering Industry
Management Research News (January,1984)
RELATION BETWEEN FABRIC MECHANICAL PROPERTIES AND GARMENT DESIGN AND TAILORABILITY
International Journal of Clothing Science and Technology (March,1990)
Show car to road car in 18 months
Assembly Automation (December,2001)
Related Chapters
3D geological model of the completed Farringdon underground railway station
Crossrail Project: Infrastructure design and construction
An overview of BIM
BIM in Principle and in Practice
3D numerical analysis of sprayed concrete lined tunnels: Influence and optimisation of the simulation of varied construction schemes
Crossrail Project: Infrastructure design and construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
