Skip to Main Content
Article navigation

A simulation procedure is presented to estimate the throughput availability of a serially interconnected manufacturing system. The model presented in the article is able to analyse, predict and suggest ways for improving productivity. The model is applicable to systems with branching and converging process streams, recycling, and intermediate buffer storages. The simulation has been carried out for a wire‐rope manufacturing plant and has been implemented by using a personal computer.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal