Keywords: Cycle time
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
International Journal of Operations & Production Management (1998) 18 (3): 233–245.
Published: 01 March 1998
... on short lead times or because they choose to pursue other objectives such as cost reduction by means of reducing their manufacturing cycle times. A step‐by‐step method is proposed based on the analyses of a number of Brazilian “best practice” cases (all manufacturing companies and all part of large multi...
Journal Articles
International Journal of Operations & Production Management (1997) 17 (6): 574–591.
Published: 01 June 1997
...Billy Ng; Bruce G. Ferrin; John N. Pearson Reviews the literature of purchasing and transportation management to identify factors in the purchasing and transportation processes that influence a firm’s ability to reduce total cycle time. Presents a model of these factors to establish a framework...
Journal Articles
International Journal of Operations & Production Management (1996) 16 (10): 67–88.
Published: 01 October 1996
... the objective of maximizing profit (but just the minimization of the loss per component, or the maximization of the rate of output which might lead to non‐optimal profit), and used a continuous approximation of the discrete production process. Closed loop control Cycle time Machine set up Sensitivity...
Journal Articles
International Journal of Operations & Production Management (1996) 16 (2): 141–158.
Published: 01 February 1996
... production”, sometimes synonymous with “Toyotism”, as an industrial model and the impact of socio‐economic and socio‐cultural contexts on manufacturing models and industrial models. Concludes that the Uddevalla plant highlights the paradox that long cycle time work in parallel flow assembly systems...
Journal Articles
International Journal of Operations & Production Management (1992) 12 (7-8): 187–196.
Published: 01 July 1992
...Jan C. Fransoo In a changing and more dynamic market of the 1980s, available mathematical programming algorithms on which production planning in process industries was based did not provide the required responsiveness. Although it is suggested in the literature that a variable cycle times policy...

or Create an Account

Close Modal
Close Modal