Skip to Main Content
Article navigation

The group‐based preemptive scheduling provides a flexible mechanism to define the preemptive relations between tasks. However, this scheduling scheme together with a resource access synchronization protocol and the requirements of fault tolerance makes the predication of a real‐time system’s behaviors more difficult than traditional scheduling scheme. The major contribution of this work is an algorithm to calculate the worstcase response time for tasks under the group‐based preemptive scheduling. This algorithm supports both the fault‐free and the primary‐alternative fault‐tolerance scheduling mechanism. Moreover, a method to calculate the minimum allowed time between two consecutive faults is also introduced. The algorithm has been implemented in a time analysis tool and integrated into a system development platform, which is compatible with the OSEK/VDX operating system standard, to verify the temporal property in the early system design step.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal