As part of the productivity movement, the Singapore government is this year (2001) legislating for “buildability”. Consequently, all building projects will need to fulfill a minimum buildable score before their development and building plans can be approved. Achievement of higher buildable scores can be attained by greater use of prefabrication technology. The Building and Construction Authority is attempting to promote the just‐in‐time (JIT) philosophy for managing precast concrete components. Components are expected to be manufactured and delivered just in time for installation and erection on site. By means of a survey, this paper examines the readiness of precasters in Singapore to adopt the JIT philosophy in producing and delivering precast concrete components to contractor‐clients.
Article navigation
Research Article|
July 01 2001
A study of the readiness of precasters for just‐in‐time construction
Low Sui Pheng;
Low Sui Pheng
Low Sui Pheng is at the School of Design and Environment, National University of Singapore, Singapore.
Search for other works by this author on:
Choong Joo Chuan
Choong Joo Chuan
Choong Joo Chuan is at Hua Kok Precast Pte Ltd, Singapore.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7190
Print ISSN: 0043-8022
© MCB UP Limited
2001
Work Study (2001) 50 (4): 131–140.
Citation
Sui Pheng L, Joo Chuan C (2001), "A study of the readiness of precasters for just‐in‐time construction". Work Study, Vol. 50 No. 4 pp. 131–140, doi: https://doi.org/10.1108/00438020110391855
Download citation file:
316
Views
New and popular articles
Suggested Reading
Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey
International Journal of Productivity and Performance Management (March,2016)
Relationship among organizational support, JIT implementation, and performance
Industrial Management & Data Systems (August,2001)
The Impact of the Just‐in‐Time Approach on Production System Performance: A Survey of Italian Industry
International Journal of Operations & Production Management (January,1992)
The misplaced origin of just‐in‐time production methods
Management Decision (February,2002)
A review of enabling factors in construction industry productivity in an Australian environment
Construction Innovation: Information Process Management (April,2014)
Related Chapters
Efficient Green Logistics in Urban Areas: Milk Run Logistics in the Automotive Industry
Sustainable Transport for Chinese Cities
Implementing Lean Manufacturing Approach in SMEs: A Case Study From the Food Processing Industry in Albania
Digitalization, Sustainable Development, and Industry 5.0: An Organizational Model for Twin Transitions
Performance-Related Pay, Unions, and Productivity in Italy: Evidence from Quantile Regressions
Advances in the Economic Analysis of Participatory and Labor-Managed Firms
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.