Open figure viewer
ON January 10th last, President Nasser switched on the first of seven main and two auxiliary turbines of the hydro‐electric installation on the existing Aswan Dam on the River Nile, which, altogether, will provide 1,860 kWh of electricity.
This content is only available via PDF.
© MCB UP Limited
1960
You do not currently have access to this content.
