Skip to Main Content
Article navigation
Purpose

This article aims to suggest to managers involved in re‐engineering projects a method to assess the feasibility of manufacturing re‐insourcing.

Design/methodology/approach

At first, an analysis of the textile sector is carried out. Subsequently, a methodology is described, able to assess the feasibility of manufacturing re‐insourcing. As a case study, a high production shop is then proposed and sized for the quick response requirements of a company producing young apparel lines on behalf of third parties. Finally, an economic evaluation is carried out in order to assess the profitability of the re‐insourcing strategy.

Findings

A methodology which can aid managers to assess the feasibility of manufacturing re‐insourcing in re‐engineering programs is proposed.

Originality/value

The proposed methodology is original.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal