Discusses the twofold purpose of this study, first to introduce a number of measures devised to be used in comparing and evaluating two schedules for the same project, second to present and evaluate a heuristic procedure developed in this research for solving the resource constrained project scheduling problem. Posits that the new procedure is based on the notion that a project can be partitioned into a number of sections and there is no obligation to use a single policy all the way through all the sections of project. Shows that this research is also an attempt to bridge the gap between the theory and practice by eliminating the question of which priority rule to use for which project. Develops a new model showing that selecting from a number of priority rules is not required and, using the measures of performance introduced, decides on a suitable schedule from the schedules produced under varied assumptions is shown to be much easier. Concludes with suggestions for further research.
Article navigation
1 December 1996
Research Article|
December 01 1996
Network‐based project planning and scheduling
Homayoun Khamooshi
Homayoun Khamooshi
Senior Lecturer, Faculty of Management and Business, Nene College of Higher Education, Northampton, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-5783
Print ISSN: 0263-5577
© MCB UP Limited
1996
Industrial Management & Data Systems (1996) 96 (8): 13–22.
Citation
Khamooshi H (1996), "Network‐based project planning and scheduling". Industrial Management & Data Systems, Vol. 96 No. 8 pp. 13–22, doi: https://doi.org/10.1108/02635579610151711
Download citation file:
New and popular articles
Suggested Reading
Flexibility and responsiveness of machining environments
Integrated Manufacturing Systems (August,1998)
Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand
Smart and Sustainable Built Environment (April,2022)
Dynamic scheduling model for the construction industry
Built Environment Project and Asset Management (January,2020)
Dynamic scheduling: influential and influenced factors and their interrelationships in the New Zealand construction industry
Smart and Sustainable Built Environment (April,2025)
An Examination of Resourcing Policies for the Multi‐resource Problem
International Journal of Operations & Production Management (May,1993)
Related Chapters
QUALITY OF CONCRETE STRUCTURES THROUGH STANDARDS APPLICATIONS
Application of Codes, Design and Regulations: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Are Operations Management Dimensions Necessary For Firm Performance?: A Necessary Condition Analysis
Amplifying Management Research for the Common Good: Lessons for Curious Individuals and Organizations—Insights From Practitioners in the Field
Quality Evaluation of Contractor’s Schedule in the Bidding Phase
10th Nordic Conference on Construction Economics and Organization
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.