A good and efficient road network forms the primary infrastructure that propels the development process in a country. There has been a rapid increase in the demand for highway infrastructure in India as freight traffic increased 180 times and passenger traffic increased 132 times between 1951 and 2000, whereas the total length of the road has just gone up by 8 times for the same period. Further to this, with the conventional way of depending on Government fiscal budgets for development of highway infrastructure having become impractical, Private Sector Participation (PSP) is the only effective solution to meet the rising infrastructure demands. Private sector participation in highway infrastructure projects in India has been observed presently under two major formats: BOT – Toll based and BOT – Annuity based models. BOT – Toll based model has been seen to be a failure in terms of expected returns to the concessionaire whereas the relatively newer Annuity model has been found to be attractive to the private sector. However, there exists an ambiguity whith respect to their suitability in a given case and in decision‐making. Using System Dynamics approach a framework is developed that would enable the decision maker to decide particular type of prievate sector participation (PSP) m odel for a given highway project. It is observed that the concessionaire’s desired rate of return and the traffic growth projections are the key parameters in selection of PSP model.
Article navigation
1 January 2006
Research Article|
January 01 2006
Evaluation of private sector participation models in highway infrastructure in India – a system dynamics approach Available to Purchase
K.C. Iyer;
K.C. Iyer
Department of Management Studies, Indian Institute of Technology Delhi, Vishwakarma Bhavan, Shaheed Jeet Singh Marg, New Delhi – 110016, India
Search for other works by this author on:
R. Balamurugan
R. Balamurugan
Contracts Department, Punj Lloyd Limited, Punj Lloyd House, 17‐18 Nehru Place, New Delhi – 110019
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2049-3207
Print ISSN: 0972-7981
© Emerald Group Publishing Limited
2006
Journal of Advances in Management Research (2006) 3 (1): 44–58.
Citation
Iyer K, Balamurugan R (2006), "Evaluation of private sector participation models in highway infrastructure in India – a system dynamics approach". Journal of Advances in Management Research, Vol. 3 No. 1 pp. 44–58, doi: https://doi.org/10.1108/97279810680001238
Download citation file:
Suggested Reading
The impact of socio-political and economic environments on private sector participation in energy infrastructure delivery in Ghana
Journal of Engineering, Design and Technology (April,2017)
Effects of the GASB No. 34 infrastructure reporting standards on state highway infrastructure quality: A panel data analysis
Journal of Public Budgeting, Accounting & Financial Management (June,2018)
A survey of critical success factors for attracting private sector participation in water supply projects in developing countries
Journal of Facilities Management (February,2017)
The trickle-down effect of psycho-social constructs and knowledge deficiencies as organizational barriers to cost performance on highway projects
Journal of Financial Management of Property and Construction (April,2018)
Identifying risks and mitigation strategies in private sector participation (PSP) in power generation projects in Ghana
Journal of Facilities Management (May,2017)
Related Chapters
Chapter 4 Tourism transport, technology, and carbon dioxide emissions
Tourism and the Implications of Climate Change: Issues and Actions
Analysing Smart Tourism Ecosystems for Sustainable Development: A System Dynamics Approach
Shaping Collaborative Ecosystems for Tomorrow
Feasibility Study Methods for Entrepreneurs in Sustainability-related Ventures
Entrepreneurship, Institutional Framework and Support Mechanisms in the EU
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
