Purpose

This paper aims to unpack the relationship between the interactive use of project control systems (PCS) and project performance by examining the role of stakeholder analysis effectiveness in enacting this relationship. A conceptual framework was developed based on the stakeholder theory and the levers of control framework.

Design/methodology/approach

Partial least square-structural equation modelling analysis was conducted on the cross-sectional questionnaire data collected from 109 information technology (IT) projects.

Findings

The interactive use of PCS enables project managers to effectively deal with the stakeholders-related uncertainty, and stakeholder analysis effectiveness partially mediates the positive relationship between the interactive use of PCS and IT project performance.

Originality/value

This study extends the project control literature by explaining the positive relationship between the interactive use of PCS and project performance. The findings contribute to the stakeholder analysis literature by operationalizing the stakeholder analysis effectiveness construct and identifying it as a new mediator between the interactive use of PCS and project performance.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Register

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period.