The project involved the grade separation of the A34 at junction 13 of the M4 motorway and was carried out under a design-and-build contract. Three integral bridges with contiguous pile wall abutments and Y-beam and slab decks were designed for construction in a top-down sequence while maintaining three lanes of traffic in each direction on the M4. This paper describes the design process, including derivation of earth pressures on the integral abutments, analysis of the soil–structure interaction and the global analysis of the structure. Comparison is made between the design methods required by BD 42/00 which embodies CIRIA Report 104 and the recently published CIRIA C580, and matters pertaining to the design of integral bridges with frame and embedded type abutments are identified for discussion.
Article navigation
March 2005
Research Article|
March 01 2005
A34 Chieveley/M4 junction 13 improvement: design Available to Purchase
D. Place, BSc(Eng), CEng, MICE;
D. Place, BSc(Eng), CEng, MICE
Structures Design Manager
Mott MacDonald
Croydon, UK
Search for other works by this author on:
I. Farooq, MSc, CEng, MICE, PE(Ca), MASCE;
I. Farooq, MSc, CEng, MICE, PE(Ca), MASCE
Senior Geotechnical Engineer
Mott MacDonald
Croydon, UK
Search for other works by this author on:
S. Carter, MEng, CEng, MICE
S. Carter, MEng, CEng, MICE
Senior Engineer
Mott MacDonald
Croydon, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 27 2004
Accepted:
November 17 2004
Online ISSN: 1751-7664
Print ISSN: 1478-4637
© 2005 Thomas Telford Ltd
2005
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2005) 158 (1): 15–23.
Article history
Received:
April 27 2004
Accepted:
November 17 2004
Citation
Place D, Farooq I, Carter S (2005), "A34 Chieveley/M4 junction 13 improvement: design". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 158 No. 1 pp. 15–23, doi: https://doi.org/10.1680/bren.2005.158.1.15
Download citation file:
Suggested Reading
Proceedings of the Institution of Civil Engineers 2004: Bridge Engineering, vol. 157
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2004)
Bridge Engineering: Referees for 2005
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2006)
Book review
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2006)
Announcement: Award-winning papers in 2005
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2006)
Book Review
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2006)
Related Chapters
Introduction
Bridge Construction Equipment
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
Tension cables in suspension bridges. A case of form-finding
Tension Structures: Form and behaviour
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.