This short paper describes the replacement of a failed timber footbridge in Cumbernauld, North Lanarkshire, UK. The significance of the paper is its recognition of the importance of providing and maintaining sustainable walking and cycling links within an urban environment. This is demonstrated in the speed of delivery of the project and its minimisation of disruption to the users, together with the use of sustainable-source, low-maintenance materials. It emphasises the significance of sustainable development in urban regeneration, and the need to develop the existing pattern of usage of walkways and cycleways, thereby encouraging healthy alternative means of transport, and avoiding the promotion of a culture where short journeys are made by car.
Article navigation
December 2005
Research Article|
December 01 2005
The replacement of Carbrain Gully footbridge
D. Greenslade
D. Greenslade
Senior Engineer
Structures Maintenance Section, North Lanarkshire Council
Cumbernauld, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 23 2005
Accepted:
September 09 2005
Online ISSN: 1751-7664
Print ISSN: 1478-4637
© 2005 Thomas Telford Ltd
2005
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2005) 158 (4): 179–184.
Article history
Received:
March 23 2005
Accepted:
September 09 2005
Citation
Greenslade D (2005), "The replacement of Carbrain Gully footbridge". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 158 No. 4 pp. 179–184, doi: https://doi.org/10.1680/bren.2005.158.4.179
Download citation file:
252
Views
New and popular articles
Suggested Reading
Briefing: Stress lamination: utilising low-grade timber in construction
Proceedings of the Institution of Civil Engineers - Construction Materials (February,2006)
Design and construction of a ‘pointed’ arch bridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2007)
Z-spike rejuvenation of timber railroad bridge members
Proceedings of the Institution of Civil Engineers - Structures and Buildings (August,2010)
Mechanically laminated timber arched suspension bridge
Proceedings of the Institution of Civil Engineers - Structures and Buildings (July,2014)
The design and construction of Itford Farm Bridleway Bridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2007)
Related Chapters
Rethinking urban regeneration? Insights into the future through use of the Strategic-relational approach
Looking for Consensus?: Civil Society, Social Movements and Crises for Public Management
Collaborative Strategy for Tourism Development and Regeneration: Italy’s Coast of Naples
Knowledge Transfer to and within Tourism: Academic, Industry and Government Bridges
Urban drainage and development
ICE Handbook of Urban Drainage Practice
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
