Jamestown Viaduct is a six-span railway viaduct constructed between 1887 and 1890 in Scotland, UK. The four main spans are of early steel construction, supported by masonry piers and abutments. Each of the steel spans comprises two simply supported main truss girders with cross-girders supported on the top chords at truss nodes with rail bearers and steel deck plates supporting ballasted track. The structure is Grade B listed. Previous structural assessments had shown that the viaduct did not meet Network Rail's requirements in terms of live load-carrying capacity. A design competition was used by Network Rail and Mowlem (now part of Carillion plc) to choose an outline design for strengthening. This paper describes the unique solution proposed and developed by Corus to take advantage of an eight-day possession for maintenance work on the nearby Forth Bridge. The work involved removal of the track and construction of an in situ reinforced concrete slab at deck level designed to act compositely with the existing truss girder top chords and cross-girders.
Article navigation
June 2007
Research Article|
June 01 2007
Jamestown Viaduct, UK: strengthening of an early steel viaduct Available to Purchase
C. Roberts, MSc, ACGI, CEng, MICE;
Corus Railway Infrastructure Services
York, UK
Search for other works by this author on:
A. Hanson, BEng(Hons);
A. Hanson, BEng(Hons)
Engineer
Corus Railway Infrastructure Services
York, UK
Search for other works by this author on:
D. Henderson, BEng(Hons);
D. Henderson, BEng(Hons)
Business Development Manager
Carillion Regional Civil Engineering
Kilsyth, Glasgow, UK
Search for other works by this author on:
G. Bell, HNC, HND
G. Bell, HNC, HND
Project Engineer
Network Rail Scotland
Glasgow, UK
Search for other works by this author on:
*
Since the submission of this paper, Clive Roberts has sadly passed away
Publisher: Emerald Publishing
Received:
May 02 2006
Accepted:
November 14 2006
Online ISSN: 1751-7664
Print ISSN: 1478-4637
© 2007 Thomas Telford Ltd
2007
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2007) 160 (2): 57–63.
Article history
Received:
May 02 2006
Accepted:
November 14 2006
Citation
Roberts C, Hanson A, Henderson D, Bell G (2007), "Jamestown Viaduct, UK: strengthening of an early steel viaduct". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 160 No. 2 pp. 57–63, doi: https://doi.org/10.1680/bren.2007.160.2.57
Download citation file:
340
Views
Suggested Reading
Fuzhou–Xiamen high-speed railway: a new paradigm for China’s cross-sea railways
Proceedings of the Institution of Civil Engineers - Civil Engineering (June,2023)
Field testing of a 30-year-old composite Preflex railway bridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2007)
Great Western railway electrification, UK: civil engineering works
Proceedings of the Institution of Civil Engineers - Civil Engineering (September,2020)
Bridgeworks on the East London railway line extension, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2008)
Analyses of a composite bowstring truss with tension stiffening
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2003)
Related Chapters
USE OF COMPOSITE STRUCTURES IN A BUILDING ABOVE A METRO STATION
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Introduction
Bridge Construction Equipment
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.