This paper benchmarks the challenges involved with major sea, or fixed link, bridge crossings from their planning to final construction. An overview of existing major fixed link crossings globally, including statistical information such as length and inflation-adjusted project costs, is given. Data for well-known links such as the Øresund Crossing in Europe and the more recent Hong Kong–Zhuhai–Macau Bridge are included. The construction methods required to surmount the challenges of bridging such crossings and how advancements are making long-mooted crossings more feasible are discussed. Statistics on the construction durations of these crossings are presented and links between construction time, cost aspects and carbon dioxide emissions are considered. Finally, the paper looks to the future and considers how the data can be used to better bound estimates of time, costs, and emissions for fixed link projects. The viability of some of the more notable future fixed link projects is also addressed.
Article navigation
1 September 2023
Research Article|
May 10 2022
Global fixed link bridges: state of the art Available to Purchase
Paul Mullins, BE, CEng, MIEI, MIStructE, IntPE(Irl);
Paul Mullins, BE, CEng, MIEI, MIStructE, IntPE(Irl)
Technical Director for Bridges, Asia, Jacobs, Kuala Lumpur, Malaysia (corresponding author: paulmullins@gmail.com)
Search for other works by this author on:
David Collings, BSc, PhD, CEng, FICE
David Collings, BSc, PhD, CEng, FICE
Technical Director, Arcadis, Guildford, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
January 15 2022
Accepted:
April 14 2022
Online ISSN: 1751-7664
Print ISSN: 1478-4637
Emerald Publishing Limited: All rights reserved
2022
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2023) 176 (3): 143–153.
Article history
Received:
January 15 2022
Accepted:
April 14 2022
Citation
Mullins P, Collings D (2023), "Global fixed link bridges: state of the art". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 176 No. 3 pp. 143–153, doi: https://doi.org/10.1680/jbren.22.00001
Download citation file:
Suggested Reading
The Governor Mario M. Cuomo Bridge, NY, USA: solutions to complex geotechnical conditions
Proceedings of the Institution of Civil Engineers - Bridge Engineering (January,2023)
Feasibility study, design and construction of the 27 km long Temburong Bridge, Brunei
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2022)
Feasibility study and preliminary design of Bataan–Cavite interlink bridge, Philippines
Proceedings of the Institution of Civil Engineers - Bridge Engineering (April,2023)
Construction of the Queensferry Crossing and approach roads in Scotland (part 1).
Proceedings of the Institution of Civil Engineers - Civil Engineering (December,2018)
Design and construction of the A4232 Eastern Bay link phase 1, Cardiff, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (January,2019)
Related Chapters
FAST TRACK DESIGN AND CONSTRUCTION OF CONCRETE BRIDGES
Concrete for Transportation Infrastructure: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Shenzhen Western Corridor
Role of Concrete Bridges in Sustainable Development: Proceedings of the International Symposium held at the University of Dundee, Scotland, UK on 3–4 September 2003
FIBRE COMPOSITES IN CIVIL ENGINEERING: AN OPPORTUNITY FOR A NOVEL APPROACH TO TRADITIONAL REINFORCED CONCRETE CONCEPTS
Challenges of Concrete Construction: Volume 1, Composite Materials in Concrete Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.