Article navigation

Aparicio Á. C. and Ramos G.

Footbridge over the Sant Adria Marina, Barcelona, Spain. Dec., 193–200

Bell B.

An integral composite bridge of high skew. Discussion. Mar., 37

Brownjohn J. M. W. and Middleton C.

Efficient dynamic performance assessment of a footbridge. Dec., 185–192

Burgoyne C. see Xu Q. and Burgoyne C.

Carstairs N. A. see Riches O. J. et al.

Carter S. see Place D. et al.

Corbett P. W. and Edmonds M. A.

Upgrading of Central Motorway junction, Auckland. Mar., 25–36

Curran P.

Editorial. Dec., 141

Dakers J. J. see Mays G. C. and Dakers J. J.

Edmonds M. A. see Corbett P. W. and Edmonds M. A.

Ekeberg P. K. and Søyland K.

Filsa Bridge, Norway—a record-breaking timber bridge. Mar., 1–7

Farooq I. see Place D. et al.

Firth I. P. T. see Sanders P. A. and Firth I. P. T.

Flaig K. D. and Lark R. J.

A risk-based decision-support strategy for bridge management. Sep., 101–106

Freedman G. see Kermani A. and Freedman G.

Greenslade D.

The replacement of Carbrain Gully footbridge. Dec., 179–184

Hobbs R. E. see Wong S. M. et al.

Huang M.-H., Thambiratnam D. and Perera N. J.

Resonant vibration of shallow suspension footbridges. Dec., 201–209

Hughes T. G.

William Edwards Bridge, Pontypridd, UK. Jun., 71–80

Jones A. E. K. see Riches O. J. et al.

Kermani A. and Freedman G.

Performance of a stress-laminated-timber arch bridge. Dec., 155–164

Lark R. J. see Flaig K. D. and Lark R. J.

Mays G. C. and Dakers J. J.

Open sandwich bridge deck construction–20 years on. Jun., 81–89

Metheringham S. and Townshend J.

A1 River Tyne bridge, UK—design and construction. Jun., 45–52

Middleton C. see Brownjohn J. M. W. and Middleton C.

Onof C. J. see Wong S. M. et al.

Pavic A. see Živanović S. et al.

Perera N. J. see Huang M.-H. et al.

Place D., Farooq I. and Carter S.

A34 Chievely/M4 junction 13 improvement: design. Mar., 15–23

Ramos G. see Aparicio Á. C. and Ramos G.

Reynolds P. see Živanović S. et al.

Riches O. J., Carstairs N. A. and Jones A. E. K.

A simplified integral composite bridge connection. Jun., 63–69

Roberts T. M.

Probabilistic pedestrian lateral excitation of bridges. Jun., 53–61

Sanders P. A. and Firth I. P. T.

Design and construction of the Sail Bridge, Swansea, UK. Dec., 143–153

Smith D. A.

Refurbishment of the old Medway bridge, UK. Sep., 129–139

Søyland K. see Ekeberg P. K. and Søyland K.

Sumon S. K.

Innovative retrofitted reinforcement techniques for masonry arch bridges. Sep., 91–99

Thambiratnam D. see Huang M.-H. et al.

Townshend J. see Metheringham S. and Townshend J.

Waters R. A.

Repair and stabilisation of Trinity Bridge, Crowland, UK. Mar., 9–13

Wong S. M., Onof C. J. and Hobbs R. E.

Models for evaluating the costs of bridge failure. Sep., 117–128

Xu Q. and Burgoyne C.

Thermal-creep analysis of concrete bridges. Sep., 107–115

Živanović S., Pavic A. and Reynolds P.

Human–structure dynamic interaction in footbridges. Dec., 165–177

or Create an Account

Close subscription notice
Close access options